Walls & Ceilings
  Home
  Subscribe
  eNewsletter
  Subscription Customer Service
  Online
  Breaking News
  Web-only Features
  Video
  Blog
  Bulletin Board
  Career Center
  Case Studies
  White Papers
  Webinars
  Current Issue
  Cover Story
  Features
  Columns
  Industry News
  Product Focus
  Product Toolbox
  Calendar of Events
  Special Sections
  Excellence In Design
  High Performance Building Envelope
  High on Safety
  Convention Companion
  Tool & Equipment Guide
  Resources
  Archives
  Digital Edition Archive
  W&C Architect Archives
  Blue Book
  AEC Store
  Classified Ads
  Industry Links
  Showrooms
  Manufacturer Profile
  Product & Lit Showcase
  Web Showcase
  Trade Show Directory
  Photo Gallery
  Market Research
  WC Info
  Media Kit
Search in: EditorialProductsCompanies
Hakuna Matata!
by Nick Moretti
May 1, 2004

ARTICLE TOOLS
EmailEmailPrintPrintReprintsReprintsshareShareshare Use

An American manufacturer introduces South Africa to its panel construction system.


The African men learned to set and cut panels in a very short time, even though they spoke little or no English.


Ohio, in any given January, is generally no place to be if one isn’t a fan of cold. Typically, the cold sets in, the roads are often slushy and the green landscape of a few months back is now a blanket of gray snow. This year in the state, there were almost record lows.

Given these realities, one Hamilton, Ohio-based manufacturer took a trek to Africa to enjoy a warmer climate and a cultural construction odyssey.

On January 25, 2004, the T. Clear Corp. went to Cape Town, South Africa, to install its building system, the ProTEC concrete structural insulated panel, to the people living in Mitchell’s Plain. The project was a collaboration between the company, the Ohio Southern Africa Trade Office and Applied Innovation Inc., of Columbus, Ohio.

Ted Clear, president of T. Clear and Jeff Ketterer, product manager for ProTEC, made the 18-hour flight to Cape Town to assist in the construction phase of the project.

“I made the promise to the people of South Africa that we would come to Cape Town and have the ProTEC walls up and set roof trusses during our five day visit,” Clear says. “I was told that this would be impossible because of the complexity of the project.”

The facility that was constructed was an Assisted Living Complex for Ohio/Catholic Welfare and Development. The facility constructed was a six-bedroom, two-bathroom structure complete with a lounge, living room, dining room, kitchen and laundry room. More than 125 panels were used on the exterior and interior walls and required three different lengths of panels.



Out of Africa

The African government has set monies aside for affordable, decent housing for the people of the country.


T. Clear worked in South Africa with Stocks Building Africa. Stocks Building is a major construction company in the Western Cape and was interested in introducing the technology in the area. Jacques Du Toit, managing director for Stocks, coordinated the construction of the project.

“We have been working closely with Jacques since our visit in an effort to bring our product to an affordable housing project with Stocks,” says Ketterer. “We are currently working on house plans ranging in the 30 to 35 square meter range. The plans are being modified slightly to work most efficiently with our panelized system.”

One of the most interesting twists to the project according to Clear and Ketterer was the crew that they had the opportunity to work with.

“We actually worked with some of the men from the Mitchell’s Plain development,” according to Clear. “The men had little or no construction background and had never seen this panel system. On top of this, they spoke little or no English and we didn’t speak any Africanse. However, the men learned how to set and cut panels in a very short time frame and communicate with one another. Jeff actually ran the crew and showed them how to set panels and use our nail-gun.”

“The men were afraid of the nail-gun when I first showed them how to operate it,” Ketterer adds. “They had never been exposed to this kind of technology.”



SIPping safari

A big hurdle for the African government is the time required to build the amount of housing needed.


Traditional building practices in this area are out of concrete bricks and block. It is a very time consuming effort to construct homes. According to Jacque Du Toit, the African government has set monies aside for affordable, decent housing for the people of Africa. The main issue is the time involved to build the amount of housing that is needed. This is where this panel system has a great advantage over traditional practices.

“We feel that we can set panels on four to five houses a day in the range being looked at,” says Ketterer. “This would simply blow away anything that I saw during our week stay in the area.”

In addition to the speed of construction, the panel system also offers mold and moisture resistance and R-20 insulation value. The company provided framing, insulation and sheathing all in a ready-to-finish panel, inside and out. Each panel consists of a core of Dow Chemical Styrofoam insulation, bonded, front and back, to sheets of Util-A-Crete Concrete Backer Board, also manufactured by Fin Pan Inc./T. Clear Corp. The panels are slotted and connected by means of galvanized steel channels and nail-in fasteners.

All said, it was a life changing experience for both men.

“I thought I had seen poverty in the United States but nothing compares to what I personally witnessed in South Africa,” Ketterer adds.

“Whether we sell another panel in the country or not, we had the pleasure of knowing that we made a difference in the peoples lives in South Africa,” Clear says.



Nick Moretti
morettin@bnp.com
Nick Moretti is editor for Walls & Ceilings. He can be reached at 248-244-6244.

|PrintEmail

Did you enjoy this article? Click here to subscribe to the magazine.
BNP Media