|
|
Wouldn’t it be Nice
Three units on four lots of land on the beach—all designated for family. That is what Ed Arnold, owner and president of Arnold & Associates, will have once he finalizes his new family compound in Long Beach’s Peninsula area. The retired Los Angeles fire department veteran will have his dream house for him and his children as he enjoys his twilight years right on the beach. Surf’s up.
|
2008 Tool & Equipment Guide
Welcome to Walls & Ceilings’ Second Annual Tool & Equipment Guide, a showcase of product availability from companies catering to contractors in North America. Presenting new and existing product lines, the following showcase displays a collective assortment of the tools of the trade within all realms of the wall and ceiling community.
|
Eventually, Time Heals All Wounds
In my office lies a copy of the Declaration of Independence. Maybe it’s the upcoming election and all the accompanying hype but I find myself contemplating our good fortune of living in a country that allows us rights of equality and freedom. Don’t worry, this article isn’t about politics.
|
|
GA Relocates
The
Gypsum Association has announced that it has moved out of its Washington,
D.C.-based office into Maryland.
|
TLPCA Moves
The
Texas Lathing & Plastering Contractors Associations has relocated.
|
|
Bamboo Ceiling Tiles- Pinta Acoustic Inc.
Part
of the Bioline Wood Ceiling Tile line, the bamboo tiles are environmentally
friendly, sustainable, durable, and impact resistant to tolerate varied job
site conditions and applications.
|
Ceiling Access Panels- Wind-Lock Corp.
Designed
to blend seamlessly into a drywall ceiling, these glass fiber reinforced gypsum
ceiling access panels are an aesthetically pleasing alternative to metal access
doors.
|
Communication Device- Motorola
Push-to-talk communication (PTT) is the core attribute of
Motorola iDEN handsets. PTT enables
users to instantly connect and share data via direct communication.
|
Metal Starter Track- Reward Wall Systems Inc.
The metal starter
track is designed to provide an efficient method of aligning and holding the
first course of insulating concrete forms on the footing or slab to the
dimensions of the building.
|
|
|
|
|