Walls & Ceilings logo
search
cart
facebook twitter linkedin youtube youtube Spotify Podcasts Apple Podcasts Spotify Podcasts Apple Podcasts
  • Sign In
  • Create Account
  • Sign Out
  • My Account
Walls & Ceilings logo
  • NEWS
  • TOPICS
    • Drywall
    • Stucco/EIFS
    • Ceilings
    • Steel Framing
    • Fireproofing
    • Interior Plaster
    • Building Envelope
    • Insulation
    • Technology
    • Interior
    • Exterior
    • Women In Construction
  • COLUMNS
    • Up Front
    • All Things Gypsum
    • Art & Craft of Plastering
    • Stucco Stop
    • Steel Deal
    • Industry Voices
  • PRODUCTS
    • Buzz Guide
  • EVENTS
    • Industry Events
    • Webinars
    • BUILD Expo
  • MEDIA
    • Videos
    • Podcasts
    • Photo Galleries
    • BUILD26 Videos
    • Take our Quiz!
    • Infographics
  • EXCLUSIVE
    • Newsletters
    • Top 50 Contractors
    • Contractor of the Year
    • State of the Industry
    • W&C Store
    • Market Research
    • CEUs
    • Sponsor Insights
    • Custom Content & Marketing Services
  • DIRECTORY
  • EMAGAZINE
    • eMagazine
    • Advertise
    • Archive Issues
  • SIGN UP!
Columns

The Finish Line: The Many Facets of Inspecting EIFS

By Robert Thomas
November 4, 2009


Sometimes, a project’s specifications require inspection of the EIFS. This type of inspection is a matter of a private contract-part of the business agreement to do the work. Other times, inspection is required by statute, as in cases where the building codes require inspection. Most EIFS jobs are not formally inspected: EIFS has not been relegated to the must-be-inspected world of critical construction, such as structural welds or elevators.

But when EIFS does need to be inspected, doing so adds time and cost to the EIFS bid, and hence can be a source of considerable discussion as to “how much is needed?” and “why?” to ensure a good, completed wall. So, is inspection going to become more common? Good question, but be aware that there is work underway to develop a national consensus protocol for doing EIFS inspections. This article will give you a headstart in seeing what might be coming down the road in terms of inspection requirements.

WHAT IS INSPECTION?

First, this is not a dumb question. Ask a group of people, and some will say inspection is checking the process of installing an EIFS as the original construction occurs. Others will say it is checking the EIFS after the system has been installed, such as during a real estate transaction or for a condition assessment for building evaluation purposes. This article concerns the former, and focuses on an effort to develop a standardized way of doing inspections.

IS INSPECTION NEEDED?

There are several sides to this question. The first is that inspection protocols are needed to standardize how inspections are done-to make inspections consistent and comparable in their coverage of key inspectable items. In the case of code-mandated inspections, the codes do not give details about how EIFS inspections are done.

The second side of this question is that there are inspection protocols already available that are offered as courses, including accreditation. These programs were developed based on input from members of technical and trade organizations. Some of these programs are designed for checking out the condition of existing EIFS installations, while others include EIFS as it is being installed. Some of these programs have been around for years and have hundreds of trained inspector/members. Some of these programs are quite good, yet none of the existing programs were developed by an independent, national consensus process. A consensus process is what regulatory organizations and specifiers seek, as it provides a broad-based agreement as to what is a proper program. ASTM is currently working on developing a consensus-based standard for inspections. Thus, ASTM’s work will complement existing programs.

WHO DOES THE INSPECTION?

To be effective, inspection needs to be done by a party with no interest in the outcome of the inspection, namely, an independent third party. For example, a contractor should not be inspecting his own work.

Usually, the owner hires and pays for the inspector. This is done directly by the architect or his agent. If problems arise, they are resolved by working down the contractual chain from owner to GC to subcontractor.

VISUAL INSPECTION OR TESTING OR SAMPLE-TAKING OR …

In the development of inspection standards, the key to efficient, cost-effective inspection is to keep it simple and focus on the things that matter. Splitting hairs over things that do not affect the performance or appearance of the completed EIFS is a waste of time. This means, in theory, that visual-only (non-destructive) methods should be used if possible. Taking samples and running tests are time-consuming and expensive, and should be avoided if possible. With sufficiently frequent inspection visits, critical errors should normally be caught in time to make changes without slowing down the job.

Thus, a good inspection program should be basic, and if the owner wants to add extra layers of inspection to ensure that certain aspects are right (such as flatness of the completed wall), then they can add-on such requirements, and pay for them as an extra. For example, is it really necessary to do moisture level readings of substrates on a job in Reno when it hasn’t rained in two weeks?

WHAT MUST BE INSPECTED?

For any inspection worth doing at all, certain aspects of EIFS itself must be inspected. For the EIFS product itself, these include:

Job site conditions, especially weather.

Correct EIFS products, as specified and as approved by the EIFS producer.

Condition of the substrate: type, flatness, fastening and condition.

Attachment adhesive (if used): storage, preparation and pattern.

Mechanical fasteners (if used): type and spacing.

Reinforcing mesh: weight and overlapping of ends.

Basecoat: storage, preparation, thickness and full embedment of mesh.

Finish: storage, preparation, color and texture.

Final appearance: color variations and flatness.

Of particular importance is also the interface of the EIFS and other wall components at the EIFS’ perimeter. This especially includes openings, such as window sills, sealant joints, penetrations, and parapets.

WHAT ELSE MIGHT BE INSPECTED?

The list of possible items to be inspected is endless. These optional, inspectable items are project-specific and should be developed to address concerns for the project. For example, if the project is the façade in a fancy shopping district and there are large flat wall areas, and if down-lighting is used to light the façade at night, then extreme flatness tolerance for the finish layer may be prudent. The final inspection of the wall might be backed up by observations (inspection?) of the finished wall at night.

THE INSPECTOR’S ROLE

It may seem foolish to say but the inspector’s role is to inspect. This means, at its most basic, to report on what is going on and has happened. Literally, this can be making a record of how things have been done, but may also extend to getting involved with mediating solutions to defects, of running tests, taking samples or even designing solutions. Normally, inspectors do not take on these additional roles-it’s not normally part of their contract. For instance, re-engineering construction details is the architect’s job, not the inspector’s.

HOW OFTEN IS INSPECTION NEEDED?

Continuous inspection is horribly expensive and almost never warranted. Only on huge projects with a myriad of complex wall conditions should a full-time EIFS inspector be justified. Random, unannounced visits at key times are usually enough. The times include:

Condition of substrate and installation of insulation.

Application of the basecoat.

Application of the finish.

Final check, including interfaces with adjacent materials (sealants, flashings, windows, etc.).

PRE-PLANNING

One of the ways to trim inspection costs is to have all the parties involved sit down and go over what is involved with the inspection program. This involves a pre-production meeting where everyone gets to know each other and the inspection process is presented in detail. This sort of meeting can do a lot to avoid all sorts of misunderstandings-especially involving coordination and scheduling-for the job in general.

CONCLUSION

What is to be gained from inspection? Potentially, quite a lot, but there’s no need to go overboard most of the time. EIFS has been around for decades and contractors do know how these systems are installed. The time when inspection really makes sense is with unusual, complex construction details, and with specialty types of EIFS systems that go together in ways different than the standard barrier type EIFS.

In my experience, problems with EIFS walls are usually due to basic errors in the way the product is installed and detailed, particularly in relationship to adjacent wall elements. Catching these errors at the outset prevents the whole job from being done wrong, and can save a fortune down the road.

You’ll be seeing more action in the area of inspection, especially regarding the development of specifiable national consensus standards, which will work their way into project specifications. W&C

Share This Story

Looking for a reprint of this article?
From high-res PDFs to custom plaques, order your copy today!

Robert Thomas is a nationally recognized EIFS consultant, based in Jacksonville, Fla. He was the manager of technical services for a major EIFS producer, is the author of several books about EIFS and chairs the ASTM committee on EIFS.

Recommended Content

JOIN TODAY
To unlock your recommendations.

Already have an account? Sign In

  • Abercrombie & Fitch

    EIFS in 2026: How Specialty Finishes Are Redefining Exterior Wall Systems

    As building codes, owner expectations, and design demands...
    Stucco/EIFS
    By: Regi Mendoza
  • proper air and vapor control

    From Energy Efficiency to Moisture Management: Why Air and Vapor Control Matter

    How proper air and vapor control within building...
    Building Envelope
    By: Benjamin Meyer AIA, LEED AP
  • Linear Metal Ceiling Beam Baffles

    Top 25 Ceiling Contractors of 2026

    Suspended ceilings demand precision, code compliance and...
    Ceilings
    By: John Wyatt and Tanja Kern
You must login or register in order to post a comment.

Report Abusive Comment

Manage My Account
  • eMagazine Subscription
  • Newsletters
  • Online Registration
  • Manage My Preferences
  • Subscription Customer Service

More Videos

Sponsored Content

Sponsored Content is a special paid section where industry companies provide high quality, objective, non-commercial content around topics of interest to the Walls & Ceilings audience. All Sponsored Content is supplied by the advertising company and any opinions expressed in this article are those of the author and not necessarily reflect the views of Walls & Ceilings or its parent company, BNP Media. Interested in participating in our Sponsored Content section? Contact your local rep!

close
  • medical professionals moving a patient on a stretcher through the halls of a medical building
    Sponsored byNational Gypsum Company

    What Does High Performance Mean When It Comes To Gypsum Boards?

Popular Stories

Linear Metal Ceiling Beam Baffles

Top 25 Ceiling Contractors of 2026

Wichita Biomedical Campus

Wichita Drywall Worker Dies After Scaffolding Fall

Okan Tower in Miami, Florida

OSHA Opens Investigation Into Fatal Okan Tower Column Collapse

Construction workers in safety vests install drywall

Gypsum Sales Hold Amid Market Shifts in the U.S.

Events

June 24, 2026

The Bright Side & Benefits of Designing with Integrated Lighting

Credits 1 AIA LU/HSW; 0.1 ICC CEU

This course will explore the pivotal role architects and lighting design play in creating safer, more sustainable spaces. Learn how to avoid common lighting mistakes and make informed decisions that create the best visual environment for occupants. 

January 1, 2030

Webinar Sponsorship Information

For webinar sponsorship information, visit www.bnpevents.com/webinars or email webinars@bnpmedia.com.

See our full library of webinars

View All Submit An Event

Products

2026 National Painting Cost Estimator

2026 National Painting Cost Estimator

See More Products

Related Articles

  • The Finish Line: Inspecting Eifs

    See More
  • The Finish Line: Inspecting Existing EIFS Structures

    See More
  • The Finish Line: The Origin of EIFS

    See More

Related Products

See More Products
  • Lean Builder book cover - front.jpg

    The Lean Builder

  • building codes illustated.jpg

    Building Codes Illustrated: A Guide to Understanding the 2021 International Building Code, 7th Edition

See More Products

Related Directories

  • The Williams Brothers Corp.

    The Williams Brothers Corporation is a quality manufacturer of a complete line of premium metal access doors, hose & fire extinguisher cabinets. Our access door line consists of over 24 door styles to choose from, ranging from in sizes 6x6 to 48x48, fire rated and non-rated. Custom sizes available upon request. Contact us today info@williams-brothers.com
×

Connect with the industry’s leading resource for unparalleled insights and education.

Join thousands of industry professionals today. Shouldn’t you know what they know?

JOIN NOW
  • RESOURCES
    • Advertise
    • Contact Us
    • Directories
    • Store
    • Want More
  • SIGN UP TODAY
    • Create Account
    • eMagazine
    • Newsletters
    • Customer Service
    • Manage Preferences
  • SERVICES
    • Marketing Services
    • Reprints
    • Market Research
    • List Rental
    • Survey/Respondent Access
  • STAY CONNECTED
    • LinkedIn
    • Facebook
    • Instagram
    • YouTube
    • X
  • PRIVACY
    • PRIVACY POLICY
    • TERMS & CONDITIONS
    • DO NOT SELL MY PERSONAL INFORMATION
    • PRIVACY REQUEST
    • ACCESSIBILITY

Copyright ©2026. All Rights Reserved BNP Media, Inc. and BNP Media II, LLC.

Design, CMS, Hosting & Web Development :: ePublishing