All design teams face several challenges with each new project. If a structure is urgently needed to be operational, the challenge is to create a critical path that will quickly enclose the building envelope. When an owner’s top priorities are appearance, thermal efficiency, and cost, the design must include elements that can ensure a high R-value, meet budget demand, but also provide impressive aesthetics.