The Associated General Contractors of Missouri (AGCMO) honored Power UP electrical contractors with the prestigious "Project of the Year" Keystone Award for electrical and lighting installation work on the $24 million Kiener Plaza renovation in Downtown St. Louis.
Radius at the Banks, a VaproShield project in Cincinnati, Ohio received the 2017 Elevation Award for 'Air Barrier and Moisture Management' by Design + Durability magazine.
ATAS can now provide solutions that address both of those elements, in addition to resulting in a quicker installation, which can help to control costs.
DriftTrak Headed Stud saves the time of installing DriftTrak after the slab has been poured by integrating it directly into the slab before its poured.
The new 30Avenue mixed-use development, which offers 130,000 square feet of combined retail and office space is within easy walking distance to several famed beaches on northwest Florida’s panhandle.
The new DG fire wall hanger series from Simpson Strong-Tie is ideal for Type III multi-family, multi-level building construction and easily installs on a two-hour wood stud fire wall during framing – before the drywall is in place.