Walls & Ceilings logo
search
cart
facebook twitter linkedin youtube youtube Spotify Podcasts Apple Podcasts Spotify Podcasts Apple Podcasts
  • Sign In
  • Create Account
  • Sign Out
  • My Account
Walls & Ceilings logo
  • NEWS
  • TOPICS
    • Drywall
    • Stucco/EIFS
    • Ceilings
    • Steel Framing
    • Fireproofing
    • Interior Plaster
    • Building Envelope
    • Insulation
    • Technology
    • Interior
    • Exterior
    • Women In Construction
  • COLUMNS
    • Up Front
    • All Things Gypsum
    • Art & Craft of Plastering
    • Stucco Stop
    • Steel Deal
    • Industry Voices
  • PRODUCTS
    • Buzz Guide
  • EVENTS
    • Industry Events
    • Webinars
    • BUILD Expo
  • MEDIA
    • Videos
    • Podcasts
    • Photo Galleries
    • BUILD26 Videos
    • Take our Quiz!
    • Infographics
  • EXCLUSIVE
    • Newsletters
    • Top 50 Contractors
    • Contractor of the Year
    • State of the Industry
    • W&C Store
    • Market Research
    • CEUs
    • Sponsor Insights
    • Custom Content & Marketing Services
  • DIRECTORY
  • EMAGAZINE
    • eMagazine
    • Advertise
    • Archive Issues
  • SIGN UP!

Walls & Remembrance

April 17, 2001
A museum to commemorate a national tragedy receives appropriate sensitivity in wall and ceiling construction



As visitors follow the curves of the wall through the Museum, they will pass dozens of alcoves with video monitors showing original news footage from the day of the bombing and the subsequent weeks of rescue and recovery.
Every builder soon grows accustomed to the usual pressures of performing a job on schedule and within budget. But the construction of a national museum, commemorating the victims and heroes from the Oklahoma City bombing, was an especially sensitive, emotion-laden project for everyone connected with it.

The museum is the final phase of the Oklahoma City National Memorial. The heavily symbolic and artistic outdoor memorial, with its 168 empty chairs representing the 168 people who died in the fateful blast, lies on the actual site of the razed Alfred P. Murrah Building, and was dedicated on April 19, 2000, five years to the day after the horrific event.

The museum is situated immediately east of the site, in the west end of the historic Journal Record Building, which was heavily damaged in the bombing.

In this view of the oval memento room, Larry Patterson, of D’Aurizio Drywall and Acoustics, installs studs in Flex-C Trac during construction of the suspended wall in this very special space of the Museum.

From the heart

From the beginning of construction on the museum, the various crews appeared to be inspired to honor the victims and survivors by doing their very best work, cooperating with all the other participants, and finishing the job in time for the grand opening on Presidents Day, Feb. 19, 2001.

Nick D’Aurizio, owner of D’Aurizio Drywall and Acoustics, of Oklahoma City, was no exception. His contract called for installing all the metal-stud framing and building all the walls and ceilings for the 30,000-square-foot, four-story museum. Some 15 to 20 percent of the linear feet of those walls and ceilings were specified to be curved.

Both D’Aurizio and his foreman, Larry Patterson, were very experienced with conventional methods of constructing curves in drywall. They expected each of the 500-square-foot fur-downs to take approximately eight hours for the crew to prepare, from the cutting of lengths of utility angle for shaping the curve, to the construction of a wooden template to support the shape.

But when D’Aurizio visited his local supplier, A & D Supply, to purchase materials for the project, owner George Hughes suggested that he consider using a relatively new, specialized product. Named Flex-C Trac, the product was designed and produced for the sole purpose of making curved drywall structures easier and quicker to produce, and stronger and more precise in final production.

Impressed by the concept, D’Aurizio spoke with the general contractor, Lippert Brothers Inc., who in turn sought approval of the product from the architect, C.H. Guernsey & Co. Although no one involved had seen Flex-C Trac before, it appeared to be a potential solution to achieve the precise formation of the various curves specified in the floor plan.

The total project required some 640 linear feet of Flex-C Trac. D’Aurizio says that the initial cost, while slightly higher than the conventional components of utility angle and plywood, was more than offset by the savings in time and labor. For example, each circular fur-down took a two-man team about two hours using Flex-C Trac—only one-fourth the time needed for traditional methods.

“There’s really no comparison,” says D’Aurizio, “and the result is a really smooth curve.”

“Labor-wise, it can’t be beat,” says Larry Patterson, foreman on the job. “And the structural integrity is far better than the old method of cutting and splicing track.”

This egg-shaped room features a suspended, curved wall constructed with Flex-C Trac. Below the wall are niches for 168 Plexiglas boxes, each of which will contain a photo of a person lost in the 1995 bombing, along with mementos selected by surviving friends and family members to represent the victim’s life.

Nice curves

D’Aurizio began the project in June 1999 and finished in January 2001. The use of the product relieved D’Aurizio and his team of much of the deadline stress that could have factored into the project.

Flex-C Trac was designed and developed by Frank L. Wheeler, a former carpenter, who realized the need for a better, more efficient method for framing curves. The company he founded with four partners, Flexibility Concepts, currently manufactures Flex-C Trac, and has additional construction innovations in the works.

Construction companies in Canada, Australia and New Zealand, as well as across the United States, have used the product in commercial buildings. Now residential contractors are learning about and applying Flex-C Trac.

Available in widths of 21⁄2, 35⁄8 and 6 inches, all in lengths of 10 feet, the product is easily shaped by hand, on site, to fit any specified curve. The pivotal sections allow smooth arcs, with no flat spots.

Self-tapping screws, inserted through the holes in the side legs and into the flexible, sliding straps on either side of the track, secure the channel in the desired arc. Both the straps and the channel are manufactured of galvanized steel with an ASTM rating of #A653. The steel for the channel is 20-gauge.

In anchoring the track to the ceiling and/or floor, any standard stud—either wood or metal—will fit into the U-shaped channel, at any desired interval.

Finally, the frame is covered with drywall—as in the Oklahoma City National Memorial—or with whatever material the architect specifies. Flex-C Trac is designed to hold the exact curve rigidly, avoiding the flat spots that often characterized previous methods.

Although the museum project used the product for curvilinear walls and ceilings, it is equally suitable for constructing vaults, door-arches, columns, radius stairs and other curved applications.

The spirit of purpose and cooperation that pervaded the construction of the Oklahoma City National Memorial Center made it a unique assignment for everyone involved. That energy, combined with the use of a labor-saving product, contributed to contractor Nick D’Aurizio’s assessment that this was “one of the best construction experiences I’ve ever had.”

Share This Story

Looking for a reprint of this article?
From high-res PDFs to custom plaques, order your copy today!

Recommended Content

JOIN TODAY
To unlock your recommendations.

Already have an account? Sign In

  • Abercrombie & Fitch

    EIFS in 2026: How Specialty Finishes Are Redefining Exterior Wall Systems

    As building codes, owner expectations, and design demands...
    Stucco/EIFS
    By: Regi Mendoza
  • proper air and vapor control

    From Energy Efficiency to Moisture Management: Why Air and Vapor Control Matter

    How proper air and vapor control within building...
    Building Envelope
    By: Benjamin Meyer AIA, LEED AP
  • Linear Metal Ceiling Beam Baffles

    Top 25 Ceiling Contractors of 2026

    Suspended ceilings demand precision, code compliance and...
    Ceilings
    By: John Wyatt and Tanja Kern
You must login or register in order to post a comment.

Report Abusive Comment

Manage My Account
  • eMagazine Subscription
  • Newsletters
  • Online Registration
  • Manage My Preferences
  • Subscription Customer Service

More Videos

Sponsored Content

Sponsored Content is a special paid section where industry companies provide high quality, objective, non-commercial content around topics of interest to the Walls & Ceilings audience. All Sponsored Content is supplied by the advertising company and any opinions expressed in this article are those of the author and not necessarily reflect the views of Walls & Ceilings or its parent company, BNP Media. Interested in participating in our Sponsored Content section? Contact your local rep!

close
  • medical professionals moving a patient on a stretcher through the halls of a medical building
    Sponsored byNational Gypsum Company

    What Does High Performance Mean When It Comes To Gypsum Boards?

Popular Stories

Linear Metal Ceiling Beam Baffles

Top 25 Ceiling Contractors of 2026

Wichita Biomedical Campus

Wichita Drywall Worker Dies After Scaffolding Fall

Construction workers in safety vests install drywall

Gypsum Sales Hold Amid Market Shifts in the U.S.

QXO Just Changed the Game-Here's What Contractors Are Asking

QXO Just Changed the Game-Here's What Contractors Are Asking

Events

June 24, 2026

The Bright Side & Benefits of Designing with Integrated Lighting

Credits 1 AIA LU/HSW; 0.1 ICC CEU

This course will explore the pivotal role architects and lighting design play in creating safer, more sustainable spaces. Learn how to avoid common lighting mistakes and make informed decisions that create the best visual environment for occupants. 

January 1, 2030

Webinar Sponsorship Information

For webinar sponsorship information, visit www.bnpevents.com/webinars or email webinars@bnpmedia.com.

See our full library of webinars

View All Submit An Event

Products

2026 National Painting Cost Estimator

2026 National Painting Cost Estimator

See More Products

Related Articles

  • Arms crossed building engineer and thinking construction worker woman with smile goals or real estate architecture vision happy development employee engineering or helmet on property working site

    Walls & Ceilings Introduces "Women Who Build": Elevating the Leaders Shaping the Future of Walls and Ceilings

    See More
  • Back to the Future: Walls and Ceilings Timeline

    See More
  • Review of Walls and Ceilings Plaster and Drywall Roundtable

    See More

Related Directories

  • TRUFAST Walls

    TRUFAST® is an innovative leader in fastening systems for exterior building envelopes and facades. Products include a variety of fasteners to allow installation to continuous insulation, lath, EIFS, brick veneer, and building wrap. The products are extensively tested and conform to current energy and building standards.
×

Connect with the industry’s leading resource for unparalleled insights and education.

Join thousands of industry professionals today. Shouldn’t you know what they know?

JOIN NOW
  • RESOURCES
    • Advertise
    • Contact Us
    • Directories
    • Store
    • Want More
  • SIGN UP TODAY
    • Create Account
    • eMagazine
    • Newsletters
    • Customer Service
    • Manage Preferences
  • SERVICES
    • Marketing Services
    • Reprints
    • Market Research
    • List Rental
    • Survey/Respondent Access
  • STAY CONNECTED
    • LinkedIn
    • Facebook
    • Instagram
    • YouTube
    • X
  • PRIVACY
    • PRIVACY POLICY
    • TERMS & CONDITIONS
    • DO NOT SELL MY PERSONAL INFORMATION
    • PRIVACY REQUEST
    • ACCESSIBILITY

Copyright ©2026. All Rights Reserved BNP Media, Inc. and BNP Media II, LLC.

Design, CMS, Hosting & Web Development :: ePublishing