Walls & Ceilings logo
search
cart
facebook twitter linkedin youtube youtube Spotify Podcasts Apple Podcasts Spotify Podcasts Apple Podcasts
  • Sign In
  • Create Account
  • Sign Out
  • My Account
Walls & Ceilings logo
  • NEWS
  • TOPICS
    • Drywall
    • Stucco/EIFS
    • Ceilings
    • Steel Framing
    • Fireproofing
    • Interior Plaster
    • Building Envelope
    • Insulation
    • Technology
    • Interior
    • Exterior
    • Women In Construction
  • COLUMNS
    • Up Front
    • All Things Gypsum
    • Art & Craft of Plastering
    • Stucco Stop
    • Steel Deal
    • Industry Voices
  • PRODUCTS
    • Buzz Guide
  • EVENTS
    • Industry Events
    • Webinars
    • BUILD Expo
  • MEDIA
    • Videos
    • Podcasts
    • Photo Galleries
    • BUILD26 Videos
    • Take our Quiz!
    • Infographics
  • EXCLUSIVE
    • Newsletters
    • Top 50 Contractors
    • Contractor of the Year
    • State of the Industry
    • W&C Store
    • Market Research
    • CEUs
    • Sponsor Insights
    • Custom Content & Marketing Services
  • DIRECTORY
  • EMAGAZINE
    • eMagazine
    • Advertise
    • Archive Issues
  • SIGN UP!
DrywallInsulationInterior Plaster

Eagle's Landing Apartments Creates Challenges

College apartment complex

Champlain College’s Eagle’s Landing

This is Eagle’s Landing Apartments, a $36 million student housing project designed to be home to 314 students of Champlain College.

Champlain College’s Eagle’s Landing

This is Eagle’s Landing Apartments, a $36 million student housing project designed to be home to 314 students of Champlain College.

Champlain College’s Eagle’s Landing

This is Eagle’s Landing Apartments, a $36 million student housing project designed to be home to 314 students of Champlain College.

Champlain College’s Eagle’s Landing
Champlain College’s Eagle’s Landing
Champlain College’s Eagle’s Landing
May 2, 2018

The architect perspectives of Champlain College’s Eagle’s Landing apartments make Burlington, Vt., seem like the perfect town. The building’s 600 windows look out over clean, tree-lined streets; smiling couples holding hands; a woman gardening; the neighborhood mailman making his rounds. 

Across the street from an old, white house, a brick building—large, pristine, modern—soaks in golden twilight. This is Eagle’s Landing Apartments, a $36 million student housing project designed to be home to 314 students of Champlain College. 

Its construction, though, was far from carefree. As contractors learned, lots of windows meant lots of rough openings, and potential challenges to sheathing installation. And, to add to their troubles, space was tight.

Saving Time in Tight Quarters

On paper, the Eagle’s Landing site may look winsome and endearing, almost Mayberry-esque. In truth, it is located downtown at the intersection of two busy streets and surrounded by businesses.

“The project was in the city so working space along the exterior of the building was limited,” says Michael Hulbert, senior project manager at HP Cummings and the general contractor of the project. With the excessive amount of electrical and telephone wires and poles close to the building, the drywall contractor, Optimum Building Systems LLC, felt the DensElement Barrier System was a great fit with its reduction of a complete step in the installation process.”

Project details

Component Quantities:

  • 60,000 square feet of DensElement Sheathing
  • 1600 sausages of R-Guard FastFlash liquid flashing

Key Companies:

  • Architect: Gardner Kilcoyne Architects
  • General Contractor: HP Cummings Construction

Subcontractor: Optimum Building Systems LLC

Distributor: Kamco Supply

Building Envelope Consultant: Zero by Degree

With very little elbowroom for crews to stage equipment and work on the building’s exterior, they realized they had to find a smarter system. Lack of space wasn’t the only challenge faced during construction.

A Complicated Installation, a Call for Innovation 

Once a city-owned parking lot, this Burlington complex, designed by Vermont-based Gardner Kilcoyne Architects, spreads across six floors and measures 5,200 square feet of ground-floor commercial space. There is an average of five windows for each of the building’s 105 apartments.

Meeting the continuous insulation energy requirement meant there would be 2½ inches of rigid exterior insulation applied over the DensElement Barrier System. Given the complexity of multiple rainscreen claddings, Gardner Kilcoyne Architects needed the window to be extended out beyond the exterior sheathing more than three inches to accommodate the design.

To meet this requirement, Gardner Kilcoyne Architects had to frame out the rough openings with wood. This design is becoming more common, especially in the Northeast, where self-adhered membranes are often used to wrap the extended opening. But Jim Lockerby, with glazing contractor St. Albans Glass, discerned that traditional water-resistive and air barriers, such as a self-adhered flashing membrane as originally specified, could complicate installation. Had each of the building’s 600 windows been a repeat of the same membrane-related frustrations, considerable time could have been lost.

“A self-adhered flashing membrane often reduces the window rough opening size creating potential problems with inserting the window into the wood buck,” he says.

After seeing the DensElement Barrier System, with PROSOCO R-Guard FastFlash liquid flashing in application, they realized there was a solution that was superior to a traditional self- adhered membrane.

“The general contractor felt the FastFlash was easier to visually inspect verses peel-and-stick,” adds Brian Kelly, estimator and project manager at Optimum Building Systems LLC. “It conforms to the corners on openings and directional change with the wood bucks in the windows.”

A Shared Challenge, and a Collective Solution

During the bidding process, Georgia-Pacific Sales Representative, Kurt Ouellette, approached HP Cummings with the idea of using the barrier system. It became a collective answer to the contractors’ problems due to a robust science and integrative design that fuses a water-resistive and air barrier into the gypsum core. A liquid flashing membrane—PROSOCO R-Guard Fast Flash—seals up joints, fasteners, openings, penetrations, transitions and rough openings of structured walls to finish the installation.

“He was at the right place at the right time,” says Kelly. “They talked about product, looked at it and said it’s the way to go.”

This simplification of the integrated water-resistive and air barrier sheathing became a win for everyone involved. “DensElement streamlined and reduced installation time needed for sheathing and a water-resistive and air barrier,” says Hulbert.

St. Albans’ Jim Lockerby felt their installation process was going faster due to a lack of the typical issues associated with a self-adhered membrane. Additionally, the vapor-permeable FastFlash allowed wood frames to dry to help prevent them from rotting around the windows. Kelly described the amount of time saved as substantial, gaining at least two months.

“It’s one and done,” he says. “It’s a real time-saver, with cost savings to the owner and to everyone. We saved a significant amount of money, the owner was very happy, and they achieved what they wanted to achieve at a lower cost. It was a win-win for everyone.”

Creating an Element of History

Champlain College, founded in 1878, has been a part of the Burlington, Vermont, history for almost 140 years. Now the Eagle’s Landing apartment complex, slated for completion in the summer of 2018, is a part of that history.

KEYWORDS: CI (continuous insulation) Georgia-Pacific liquid-applied sheathing WRB (weather resistant barrier)

Share This Story

Looking for a reprint of this article?
From high-res PDFs to custom plaques, order your copy today!

Recommended Content

JOIN TODAY
To unlock your recommendations.

Already have an account? Sign In

  • Abercrombie & Fitch

    EIFS in 2026: How Specialty Finishes Are Redefining Exterior Wall Systems

    As building codes, owner expectations, and design demands...
    Stucco/EIFS
    By: Regi Mendoza
  • proper air and vapor control

    From Energy Efficiency to Moisture Management: Why Air and Vapor Control Matter

    How proper air and vapor control within building...
    Building Envelope
    By: Benjamin Meyer AIA, LEED AP
  • Linear Metal Ceiling Beam Baffles

    Top 25 Ceiling Contractors of 2026

    Suspended ceilings demand precision, code compliance and...
    Ceilings
    By: John Wyatt and Tanja Kern
You must login or register in order to post a comment.

Report Abusive Comment

Manage My Account
  • eMagazine Subscription
  • Newsletters
  • Online Registration
  • Manage My Preferences
  • Subscription Customer Service

More Videos

Sponsored Content

Sponsored Content is a special paid section where industry companies provide high quality, objective, non-commercial content around topics of interest to the Walls & Ceilings audience. All Sponsored Content is supplied by the advertising company and any opinions expressed in this article are those of the author and not necessarily reflect the views of Walls & Ceilings or its parent company, BNP Media. Interested in participating in our Sponsored Content section? Contact your local rep!

close
  • medical professionals moving a patient on a stretcher through the halls of a medical building
    Sponsored byNational Gypsum Company

    What Does High Performance Mean When It Comes To Gypsum Boards?

Popular Stories

Linear Metal Ceiling Beam Baffles

Top 25 Ceiling Contractors of 2026

Wichita Biomedical Campus

Wichita Drywall Worker Dies After Scaffolding Fall

QXO Just Changed the Game-Here's What Contractors Are Asking

QXO Just Changed the Game-Here's What Contractors Are Asking

Less compound

Joint Compound Market to Reach $9.7B by 2033

Events

June 24, 2026

The Bright Side & Benefits of Designing with Integrated Lighting

Credits 1 AIA LU/HSW; 0.1 ICC CEU

This course will explore the pivotal role architects and lighting design play in creating safer, more sustainable spaces. Learn how to avoid common lighting mistakes and make informed decisions that create the best visual environment for occupants. 

January 1, 2030

Webinar Sponsorship Information

For webinar sponsorship information, visit www.bnpevents.com/webinars or email webinars@bnpmedia.com.

See our full library of webinars

View All Submit An Event

Products

2026 National Painting Cost Estimator

2026 National Painting Cost Estimator

See More Products

Related Articles

  • Petersen PAC-CLAD Minneapolis Apartments Revised Picture 1

    Metal Creates “Youthful Vibe” for New Minneapolis Apartments

    See More
  • METALCON and Military Warriors Support Foundation Unite to Build Eagles Landing Retreat for Veterans

    METALCON and Military Warriors Support Foundation Unite to Build Eagles Landing Retreat for Veterans

    See More
  • Kolbe-Apt-Rendering-Exterior-2-780-x-439.jpg

    Kolbe Builds Multifamily, Workforce Housing, Adding Affordably Priced Rental Units

    See More

Related Products

See More Products
  • plaster and drywall

    Plaster and Drywall Assemblies Manual

See More Products
×

Connect with the industry’s leading resource for unparalleled insights and education.

Join thousands of industry professionals today. Shouldn’t you know what they know?

JOIN NOW
  • RESOURCES
    • Advertise
    • Contact Us
    • Directories
    • Store
    • Want More
  • SIGN UP TODAY
    • Create Account
    • eMagazine
    • Newsletters
    • Customer Service
    • Manage Preferences
  • SERVICES
    • Marketing Services
    • Reprints
    • Market Research
    • List Rental
    • Survey/Respondent Access
  • STAY CONNECTED
    • LinkedIn
    • Facebook
    • Instagram
    • YouTube
    • X
  • PRIVACY
    • PRIVACY POLICY
    • TERMS & CONDITIONS
    • DO NOT SELL MY PERSONAL INFORMATION
    • PRIVACY REQUEST
    • ACCESSIBILITY

Copyright ©2026. All Rights Reserved BNP Media, Inc. and BNP Media II, LLC.

Design, CMS, Hosting & Web Development :: ePublishing