Walls & Ceilings logo
search
cart
facebook twitter linkedin youtube youtube Spotify Podcasts Apple Podcasts Spotify Podcasts Apple Podcasts
  • Sign In
  • Create Account
  • Sign Out
  • My Account
Walls & Ceilings logo
  • NEWS
  • TOPICS
    • Drywall
    • Stucco/EIFS
    • Ceilings
    • Steel Framing
    • Fireproofing
    • Interior Plaster
    • Building Envelope
    • Insulation
    • Technology
    • Interior
    • Exterior
    • Women In Construction
  • COLUMNS
    • Up Front
    • All Things Gypsum
    • Art & Craft of Plastering
    • Stucco Stop
    • Steel Deal
    • Industry Voices
  • PRODUCTS
    • Buzz Guide
  • EVENTS
    • Industry Events
    • Webinars
    • BUILD Expo
  • MEDIA
    • Videos
    • Podcasts
    • Photo Galleries
    • BUILD26 Videos
    • Take our Quiz!
    • Infographics
  • EXCLUSIVE
    • Newsletters
    • Top 50 Contractors
    • Contractor of the Year
    • State of the Industry
    • W&C Store
    • Market Research
    • CEUs
    • Sponsor Insights
    • Custom Content & Marketing Services
  • DIRECTORY
  • EMAGAZINE
    • eMagazine
    • Advertise
    • Archive Issues
  • SIGN UP!
Building EnvelopeDrywallInterior PlasterTechnology

Integrating BIM for Long-term Benefits

California Team Fits BIM in a CUBE

By Michael Gardner
building information modeling

Complex exterior wall systems benefit when a collaborative process is implemented using BIM modeling.

building information modeling

Complex exterior wall systems benefit when a collaborative process is implemented using BIM modeling.

building information modeling
building information modeling
September 1, 2018

In a nondescript warehouse and office building in the rolling foothills about 45 minutes northeast of San Jose, Calif., two associates are charting a next step in drywall and plaster project management by envisioning how to harness the potential of building information modeling—or BIM—in a new way.

Frank Nunes and Cody Nowak, each an industry veteran, collectively believe that assisting trade contractors with integrating BIM into their management process will reap significant long-term benefits for those willing to accept the concept.

Nunes is the CEO of the Wall and Ceiling Alliance, a Pleasanton, Calif.-based association that advocates for the interests of the wall and ceiling industry. He was instrumental in the creation of WACA in 2010 and has more than 35 years of experience in interior and exterior construction. WACA members are union drywall and plaster contractors based in Northern California.

Getting Involved with BIM

Nunes is very aware that WACA’s foray into BIM is not in itself revolutionary. “My interest is focused on expanding the partnership aspects of the BIM experience as opposed to re-casting the BIM process in itself,” he explains. “Our sense is that while there are drywall and plaster contractors involved with BIM, to date the tools have been viewed as more useful for the structural and physical infrastructure portions of projects.

“We want to change that for our constituency,” continues Nunes, “get them more comfortable with BIM, and increase contractor involvement in early project design. With the support of the WACA Board, coupled with significant input from Ben Duterte and Mike Nonn of our technical team, we’ve moved forward.” 

Recent research supports Nunes’ thoughts and suggests that while demand for BIM appears to be growing, particularly among owners and general contractors, wholesale acceptance by trade contractors continues to lag. A 2017 study by Dodge Data & Analytics found that while 46 percent of the general contractors or construction managers surveyed who were using BIM were using it on more than one-half of their projects, only 30 percent of surveyed trade contractors were doing the same. 

Interestingly, the same report found that, in general, trade contractors were comparatively more comfortable with the complexities and functionality of BIM programs than architects and engineers. According to the survey, trade contractors believe BIM’s best attribute is its ability to provide the latest version of a design and view using that trait as a means to avoid costly re-work once a project commences.

While Nunes brings the technical drywall and plaster background to the team, Nowak brings over a decade of BIM experience, including stints with an Autodesk channel partner and Martin Brothers, a leading California-based contracting firm that has done over $4 billion of work since its creation in 1932. Martin Brothers was an early adopter of BIM and Nowak helped the organization create and implement a BIM “CAVE.”

A New Kind of  Experience Room

After gaining considerable BIM experience, Nowak created the Collaborative Ultimate Building Environment (CUBE, for short) concept. 

“Given my experience as a VDC/BIM coordinator and my background in working with the AEC community,” Nowak says, “I began to believe that the conventional BIM workflow approach was becoming somewhat outdated, so I came up with the BIM CUBE model.” 

He has started CUBE, a new business that offers BIM CUBEs constructed and branded specifically to meet the needs of clients. 

Nowak designed the CUBE to be a mobile standalone room that projects on two 20-feet by 13-feet walls using a 1:1 human scale, thus creating an immersive experience of the built environment before construction commences. As changes are made in the BIM authoring tool they are reflected instantly in the 1:1 human scaled view. 

“This new approach permits owners, end users, and different trades to collaborate more effectively in real time,” explains Nowak. “I’ve also designed each CUBE to be mobile, so it can be set up at jobsites, in expos and trade shows, and in an office setting.” 

And it is indeed a 20-foot by 20-foot cube you view when you walk into the WACA warehouse. Nowak and Nunes want to make it usable by all potential input partners on a project, including manufacturers, suppliers, contractors, and designers. As a result, they intend to load the CUBE with technology that will enhance user flexibility and accommodate several design and software packages. 

The timing of this move from CAVE to CUBE appears apt based on comments contained in a recent article authored by Matt Ball of Autodesk. He notes that the “move from 2-D drawings to 3-D models is well underway and gaining steam in the architectural, engineering, and construction industries, thanks to tangible bottom-line returns from streamlined workflows.” 

Ball identified 11 benefits of using BIM and in his top five were three that fit directly into the approach Nunes and Nowak are implementing: less need for rework and duplication of drawings; improved collaboration; and better visualization of the product being produced. 

The increased complexity of construction projects is also boosting the need for BIM-oriented design, in particular those that incorporate structures that are being commissioned by high-tech companies in the San Francisco Bay Area. The challenge for WACA is to figure out how to get its members involved early-on in the design and project development stage so that they can be an effective resource for an owner or general contractor. 

“No question that is a definite need, but there’s more to it than that,” says Nunes, who goes on to explain that the BIM CUBE approach is also aimed at getting fresh, new talent into the industry and onto jobsites. “There are still some positions for tradespeople who simply want to walk onto a jobsite and do nothing more than operate a screw gun,” he says, “but what we are trying to create is an environment where individuals are fully trained in multiple aspects of construction and therefore are able to bring value to a project, both on the job and in the office. Effectively, that’s what we promote as an organization. Use our contractors and you will work with well-trained, quality individuals.” 

The Bay Area is well recognized as an incubator for innovative business thought that often is a by-product of the group-think approach taken by dedicated people working in a non-traditional environment, such as a warehouse. Maybe Frank and Cody are onto something.

KEYWORDS: BIM (Building Information Modeling) WACA (Wall And Ceiling Alliance) walls and ceilings

Share This Story

Looking for a reprint of this article?
From high-res PDFs to custom plaques, order your copy today!

Michael Gardner is the president of M Gardner Services LLC, a consulting firm that assists organizations with issues involving industry standards and building codes, meeting management, and external collaboration and outreach. Prior to establishing MGS, he was the executive vice president of Compliance Programs for the International Code Council. He is also the former CEO of the Gypsum Association, currently serves as a special technical advisor to the Wall & Ceiling Alliance and can be reached at michael@mgardnerservices.com.

Recommended Content

JOIN TODAY
To unlock your recommendations.

Already have an account? Sign In

  • Abercrombie & Fitch

    EIFS in 2026: How Specialty Finishes Are Redefining Exterior Wall Systems

    As building codes, owner expectations, and design demands...
    Stucco/EIFS
    By: Regi Mendoza
  • proper air and vapor control

    From Energy Efficiency to Moisture Management: Why Air and Vapor Control Matter

    How proper air and vapor control within building...
    Building Envelope
    By: Benjamin Meyer AIA, LEED AP
  • Linear Metal Ceiling Beam Baffles

    Top 25 Ceiling Contractors of 2026

    Suspended ceilings demand precision, code compliance and...
    Ceilings
    By: John Wyatt and Tanja Kern
You must login or register in order to post a comment.

Report Abusive Comment

Manage My Account
  • eMagazine Subscription
  • Newsletters
  • Online Registration
  • Manage My Preferences
  • Subscription Customer Service

More Videos

Sponsored Content

Sponsored Content is a special paid section where industry companies provide high quality, objective, non-commercial content around topics of interest to the Walls & Ceilings audience. All Sponsored Content is supplied by the advertising company and any opinions expressed in this article are those of the author and not necessarily reflect the views of Walls & Ceilings or its parent company, BNP Media. Interested in participating in our Sponsored Content section? Contact your local rep!

close
  • medical professionals moving a patient on a stretcher through the halls of a medical building
    Sponsored byNational Gypsum Company

    What Does High Performance Mean When It Comes To Gypsum Boards?

Popular Stories

Linear Metal Ceiling Beam Baffles

Top 25 Ceiling Contractors of 2026

Wichita Biomedical Campus

Wichita Drywall Worker Dies After Scaffolding Fall

QXO Just Changed the Game-Here's What Contractors Are Asking

QXO Just Changed the Game-Here's What Contractors Are Asking

An interior drywalling work in progress

Boost Profits with AI Scheduling

Events

June 24, 2026

The Bright Side & Benefits of Designing with Integrated Lighting

Credits 1 AIA LU/HSW; 0.1 ICC CEU

This course will explore the pivotal role architects and lighting design play in creating safer, more sustainable spaces. Learn how to avoid common lighting mistakes and make informed decisions that create the best visual environment for occupants. 

January 1, 2030

Webinar Sponsorship Information

For webinar sponsorship information, visit www.bnpevents.com/webinars or email webinars@bnpmedia.com.

See our full library of webinars

View All Submit An Event

Products

2026 National Painting Cost Estimator

2026 National Painting Cost Estimator

See More Products

Related Articles

  • Utilizing EIFS for Greater Long-term Benefits

    Utilizing EIFS for Greater Long-term Benefits

    See More
  • Sto Corp. BIM Color Collections Picture 1

    Sto Corp. Rolls Out Updated BIM Assets For All Sto Color Collections

    See More
  • Product Category Rules for Gypsum Board

    See More

Related Products

See More Products
  • bim 3e.jpg

    BIM Handbook: A Guide to Building Information Modeling for Owners, Designers, Engineers, Contractors, and Facility Managers, 3rd Edition

  • cannabis.jpg

    Cannabis For Dummies

  • Drywall: Professional Techniques for Great Results, 4th Edition

See More Products

Events

View AllSubmit An Event
  • June 24, 2026

    The Bright Side & Benefits of Designing with Integrated Lighting

    Credits 1 AIA LU/HSW; 0.1 ICC CEU This course will explore the pivotal role architects and lighting design play in creating safer, more sustainable spaces. Learn how to avoid common lighting mistakes and make informed decisions that create the best visual environment for occupants. 
View AllSubmit An Event

Related Directories

  • International Institute for Lath & Plaster

×

Connect with the industry’s leading resource for unparalleled insights and education.

Join thousands of industry professionals today. Shouldn’t you know what they know?

JOIN NOW
  • RESOURCES
    • Advertise
    • Contact Us
    • Directories
    • Store
    • Want More
  • SIGN UP TODAY
    • Create Account
    • eMagazine
    • Newsletters
    • Customer Service
    • Manage Preferences
  • SERVICES
    • Marketing Services
    • Reprints
    • Market Research
    • List Rental
    • Survey/Respondent Access
  • STAY CONNECTED
    • LinkedIn
    • Facebook
    • Instagram
    • YouTube
    • X
  • PRIVACY
    • PRIVACY POLICY
    • TERMS & CONDITIONS
    • DO NOT SELL MY PERSONAL INFORMATION
    • PRIVACY REQUEST
    • ACCESSIBILITY

Copyright ©2026. All Rights Reserved BNP Media, Inc. and BNP Media II, LLC.

Design, CMS, Hosting & Web Development :: ePublishing