Walls & Ceilings logo
search
cart
facebook twitter linkedin youtube youtube Spotify Podcasts Apple Podcasts Spotify Podcasts Apple Podcasts
  • Sign In
  • Create Account
  • Sign Out
  • My Account
Walls & Ceilings logo
  • NEWS
  • TOPICS
    • Drywall
    • Stucco/EIFS
    • Ceilings
    • Steel Framing
    • Fireproofing
    • Interior Plaster
    • Building Envelope
    • Insulation
    • Technology
    • Interior
    • Exterior
    • Women In Construction
  • COLUMNS
    • Up Front
    • All Things Gypsum
    • Art & Craft of Plastering
    • Stucco Stop
    • Steel Deal
    • Industry Voices
  • PRODUCTS
    • Buzz Guide
  • EVENTS
    • Industry Events
    • Webinars
    • BUILD Expo
  • MEDIA
    • Videos
    • Podcasts
    • Photo Galleries
    • BUILD26 Videos
    • Take our Quiz!
    • Infographics
  • EXCLUSIVE
    • Newsletters
    • Top 50 Contractors
    • Contractor of the Year
    • State of the Industry
    • W&C Store
    • Market Research
    • CEUs
    • Sponsor Insights
    • Custom Content & Marketing Services
  • DIRECTORY
  • EMAGAZINE
    • eMagazine
    • Advertise
    • Archive Issues
  • SIGN UP!
DrywallInterior Plaster

Constructability

TAKE THE ART OUT OF LEVEL 5 FINISHING.

By Jake Reece
Images courtesy of ClarkDietrich Building Systems
Images courtesy of ClarkDietrich Building Systems
Images courtesy of ClarkDietrich Building Systems
Images courtesy of ClarkDietrich Building Systems
Images courtesy of ClarkDietrich Building Systems
Images courtesy of ClarkDietrich Building Systems
March 22, 2021

Drywall finishing, in many ways, is a fine art. The amount of finesse required to achieve a perfectly smooth interior finish takes time, resources, and skill—things that wall and ceiling contractors know all too well are not always in ample supply. In fact, a recent survey from the Associated General Contractors of America revealed that 80 percent of construction companies can’t find the workers they need, forcing them to delay project timelines or even miss out on work entirely. 

But what if there was a way to take some of the art out of drywall finishing? Increasingly, contractors have found success with a growing number of solutions designed to make it easier for even beginner-level finishers to achieve expert-level results. As a result, they’re finding it easier to stay on schedule and deliver superior results for their clients.

Michael Kirlin, a union drywall finisher with 20 years of experience and foreman for PDM Constructors, one of the largest drywall companies in Philadelphia, was recently introduced to a line of ClarkDietrich finishing products that helped his crew streamline work during a project at the University of Pennsylvania. 

“In our business everything is about scheduling and quality of finish. These products are quicker, easy to install and probably most important to my company, are more cost efficient,” Kirlin says. “My company is always diving into innovative ways to produce an extraordinary product and these products will help us achieve our goals.”


Level 5 Finish: When Nothing but the Best Will Do

The skilled labor shortage is challenging no matter the job, but when the project requires a Level 5 finish, a dearth of skill and experience on the jobsite can be even more costly. A Level 5 finish is a premium result for a drywall installation specified in situations where the wall will take on a glossy paint finish, in areas where lighting may highlight imperfections in a wall texture, and in high-end spaces like formal dining rooms, hotel and casino lobbies, or corporate foyers where a perfectly smooth wall finish is desired.

Achieving a Level 5 finish requires a skilled hand. The results are primarily dependent on the application of additional joint compound above and beyond what is required of a Level 4 finish—specifically applying a final skim coat and sanding over the entire wall or ceiling surface. The good news is there are ways to help less-skilled finishers avoid some common mistakes.

But first, here is a quick breakdown of each of the finish levels:

•    Level 0: Drywall board is hung, but no finishing has been performed at all. Seams and screws are still visible, and any cracks or deformations are still present. This level of finish is usually specified in conditions where the final decoration aesthetic has not been chosen.

•    Level 1: Drywall tape has been applied over the seams with joint compound, but most of the mud that will eventually go on the wall is still not applied. Use Level 1 in areas where the drywall will be completely covered, such as in the areas above ceilings, attics, and other areas that will be generally concealed from view.

•    Level 2: A skim coat of mud is applied over the tape to blend the transition between the board and the tape and to cover any screw holes. Anything beyond a Level 2 finish is not required in applications where the drywall board will be used as a substrate, say in a kitchen or bathroom where a tile backsplash or large cabinets will be installed. In these examples, the tile or cabinets will cover any imperfections, so a Level 5 finish here would not add any benefit to the finished product.

•    Level 3: A heavier coat of joint compound is applied over the tape and screw holes to make things more even, but a perfectly flat finish is also not required here. Level 3 finish is typically applied where a medium-to-heavy texture (spray or hand-applied) will exist, such as popcorn ceilings. In these instances, there would be no added value to achieving a perfectly flat finish.

•    Level 4: This is the standard for most typical drywall projects. To get to Level 4, a second coat of compound is applied and sand smooth. If non-glossy paint finishes or wallpaper will be used, this is more than adequate for the finish because it will be mostly flat, and any small imperfections will not detract from the function of the wall system. Level 4 finish is used where light texturing, flat paints, non-continuous texturing, and wallcovering is required, but perfect finished quality is not really a detriment to the presentation of the room.

•    Level 5: This brings us to Level 5, where yet another layer of joint compound is applied to the wall and the entire surface is sanded again for a perfectly smooth finish. As discussed previously, this level of finish is for areas where any imperfections at all would be unacceptable. These conditions include where critical lighting conditions occur, when using glossy, decorative finishes, or with very dark paints. In addition, a Level 5 Finish will minimize the possibility of joint photographing as well as fasteners showing through the finish.

If time and money were no object, all finishing contractors would strive to achieve Level 5 on every job. Even in typical projects like track homes, apartment buildings or small offices, drywall contractors need to be prepared to deliver this level of finish, as certain rooms or surfaces may call for it. A flat ceiling with no popcorn texture, for example, receives a ton of sunlight throughout the day and is often one of the largest uninterrupted flat surfaces of drywall in the entire building. A Level 4 is mandatory here, but quite often a Level 5 finish is used to make sure everything looks perfect. It also cuts down on costly callbacks.


Innovative Materials Remove Much of the Guess Work

Clean transitions between dissimilar materials are crucial to maintaining the presentation of a Level 5 finish. To prevent time-consuming clean-up responsibilities, it is paramount that these transitions remain free of joint compound during the installation phase. Thankfully, there are a growing number of tools designed to take much of the artistry out of the equation, thereby helping contractors achieve master-level results no matter the skill Level of their crew.

Products with removable masking legs are one useful tool that help to simplify the steps required for a Level 5 finish. These products, such as ClarkDietrich’s Rip-Bead Products, are designed to cover the raw edges of drywall at ceilings, windows, and at the junction of other dissimilar materials. The product’s profiles feature a 1/4-inch removable leg that acts as a guide for the taping knife and a protective mask during the application of joint compound. The removable masking leg allows for a less-refined approach when applying the mud; allowing crews to work more quickly and making it virtually impossible to be “sloppy” in their application.

The mask covers the finished edge of the installation until the final sanding stage, when it is removed to allow the entire wall to be sanded as a whole, thereby achieving a perfectly flat and smooth finish. Furthermore, the product installs like any other trim material, so it doesn’t require any special training—even for contractors used to only using only metal or paper-faced trim products. 

Working with trims without a masking leg requires more precision in joint compound application, which requires a greater level of skill and a higher time investment from skilled and unskilled installers alike. Using products that simplify the process allows finishing contractors to work with haste and still maintain the same quality expected from a slower, more methodical installation technique. 

Products like these are valuable in that they free up more experienced craftsmen to focus on the portions of an installation where their increased skillset is absolutely required. If a foreman can leverage less experienced journeymen installers for more responsibilities with the same level of effectiveness, they can free their master finishers up to focus on other areas: increasing efficiency in both time-to-completion and when working with a limited number of skilled craftsmen. 

KEYWORDS: AGC (Associated General Contractors of America) finishing labor shortage

Share This Story

Looking for a reprint of this article?
From high-res PDFs to custom plaques, order your copy today!

Wc0321 feat constructability p4 author jake reece

Jake Reece is a product manager at ClarkDietrich Building Systems, where he has worked with its range of interior and exterior finishing products since 2019. He graduated from California State University, San Bernardino with a double concentration in Entrepreneurial Management and Marketing, and is a Certified Professional in Management of the American Management Association. 

Recommended Content

JOIN TODAY
To unlock your recommendations.

Already have an account? Sign In

  • Abercrombie & Fitch

    EIFS in 2026: How Specialty Finishes Are Redefining Exterior Wall Systems

    As building codes, owner expectations, and design demands...
    Stucco/EIFS
    By: Regi Mendoza
  • proper air and vapor control

    From Energy Efficiency to Moisture Management: Why Air and Vapor Control Matter

    How proper air and vapor control within building...
    Building Envelope
    By: Benjamin Meyer AIA, LEED AP
  • Linear Metal Ceiling Beam Baffles

    Top 25 Ceiling Contractors of 2026

    Suspended ceilings demand precision, code compliance and...
    Ceilings
    By: John Wyatt and Tanja Kern
You must login or register in order to post a comment.

Report Abusive Comment

Manage My Account
  • eMagazine Subscription
  • Newsletters
  • Online Registration
  • Manage My Preferences
  • Subscription Customer Service

More Videos

Sponsored Content

Sponsored Content is a special paid section where industry companies provide high quality, objective, non-commercial content around topics of interest to the Walls & Ceilings audience. All Sponsored Content is supplied by the advertising company and any opinions expressed in this article are those of the author and not necessarily reflect the views of Walls & Ceilings or its parent company, BNP Media. Interested in participating in our Sponsored Content section? Contact your local rep!

close
  • medical professionals moving a patient on a stretcher through the halls of a medical building
    Sponsored byNational Gypsum Company

    What Does High Performance Mean When It Comes To Gypsum Boards?

Popular Stories

Wichita Biomedical Campus

Wichita Drywall Worker Dies After Scaffolding Fall

Okan Tower in Miami, Florida

OSHA Opens Investigation Into Fatal Okan Tower Column Collapse

Construction workers in safety vests install drywall

Gypsum Sales Hold Amid Market Shifts in the U.S.

data center and logos

USG, Subzero Engineering Form Data Center Alliance

Events

June 24, 2026

The Bright Side & Benefits of Designing with Integrated Lighting

Credits 1 AIA LU/HSW; 0.1 ICC CEU

This course will explore the pivotal role architects and lighting design play in creating safer, more sustainable spaces. Learn how to avoid common lighting mistakes and make informed decisions that create the best visual environment for occupants. 

January 1, 2030

Webinar Sponsorship Information

For webinar sponsorship information, visit www.bnpevents.com/webinars or email webinars@bnpmedia.com.

See our full library of webinars

View All Submit An Event

Products

2026 National Painting Cost Estimator

2026 National Painting Cost Estimator

See More Products

Related Articles

  • All Things Gypsum

    Selecting GA-600 Assemblies: A Practical Guide to STC Targets and Sound Control Tradeoffs

    See More
  • PRO - An ACI Center of Excellence for Advancing Productivity Logo

    American Concrete Institute Establishes New Center of Excellence for Concrete Industry Productivity

    See More
  • Centered On Solutions

    Pre-construction Management Tips for Software (Part 1)

    See More

Related Products

See More Products
  • plaster and drywall

    Plaster and Drywall Assemblies Manual

  • Builder's Guide to Stucco, Lath & Plaster

  • Drywall: Professional Techniques for Great Results, 4th Edition

See More Products

Events

View AllSubmit An Event
  • December 10, 2025

    Next-Level Drywall Corners: Live Demo of Precision Grooving Techniques

    On-Demand This webinar will feature a live demonstration that showcases an innovative approach to creating clean, accurate drywall corners using portable grooving technology.
View AllSubmit An Event

Related Directories

  • TYPAR Construction

    The TYPAR® Weather Protection System is the most comprehensive lineup of Building Wraps, Flashings, Construction Tapes and accessories. All of it designed to work together to safeguard homes and structures.
  • Construction Specialties Inc.

    Construction Specialties is a leader in architectural product problem-solving because we embrace our customers’ complex challenges to deliver world-class solutions. And that’s how a lot of our innovations came to be considered industry standards.
×

Connect with the industry’s leading resource for unparalleled insights and education.

Join thousands of industry professionals today. Shouldn’t you know what they know?

JOIN NOW
  • RESOURCES
    • Advertise
    • Contact Us
    • Directories
    • Store
    • Want More
  • SIGN UP TODAY
    • Create Account
    • eMagazine
    • Newsletters
    • Customer Service
    • Manage Preferences
  • SERVICES
    • Marketing Services
    • Reprints
    • Market Research
    • List Rental
    • Survey/Respondent Access
  • STAY CONNECTED
    • LinkedIn
    • Facebook
    • Instagram
    • YouTube
    • X
  • PRIVACY
    • PRIVACY POLICY
    • TERMS & CONDITIONS
    • DO NOT SELL MY PERSONAL INFORMATION
    • PRIVACY REQUEST
    • ACCESSIBILITY

Copyright ©2026. All Rights Reserved BNP Media, Inc. and BNP Media II, LLC.

Design, CMS, Hosting & Web Development :: ePublishing