Walls & Ceilings logo
search
cart
facebook twitter linkedin youtube youtube Spotify Podcasts Apple Podcasts Spotify Podcasts Apple Podcasts
  • Sign In
  • Create Account
  • Sign Out
  • My Account
Walls & Ceilings logo
  • NEWS
  • TOPICS
    • Drywall
    • Stucco/EIFS
    • Ceilings
    • Steel Framing
    • Fireproofing
    • Interior Plaster
    • Building Envelope
    • Insulation
    • Technology
    • Interior
    • Exterior
    • Women In Construction
  • COLUMNS
    • Up Front
    • All Things Gypsum
    • Art & Craft of Plastering
    • Stucco Stop
    • Steel Deal
    • Industry Voices
  • PRODUCTS
    • Buzz Guide
  • EVENTS
    • Industry Events
    • Webinars
    • BUILD Expo
  • MEDIA
    • Videos
    • Podcasts
    • Photo Galleries
    • BUILD26 Videos
    • Take our Quiz!
    • Infographics
  • EXCLUSIVE
    • Newsletters
    • Top 50 Contractors
    • Contractor of the Year
    • State of the Industry
    • W&C Store
    • Market Research
    • CEUs
    • Sponsor Insights
    • Custom Content & Marketing Services
  • DIRECTORY
  • EMAGAZINE
    • eMagazine
    • Advertise
    • Archive Issues
  • SIGN UP!
Building EnvelopeExteriorStucco/EIFS

Tools to Control Interior Conditions During Construction

Managing interior job site conditions can reduce the cost of replacing wet materials.

By Peter V Burns
Tools to Control Interior Conditions During Construction
Images courtesy of Northwest Wall and Ceiling Bureau.
November 6, 2023

Measuring and controlling interior environmental conditions during construction in general, and specifically during gypsum wallboard finishing, has gained a heightened awareness and new solutions. Developers/owners and design teams are routinely creating and implementing construction moisture management plans that evaluate and mitigate moisture risks. These plans take into consideration:

  • The local climate and the construction schedule.
  • The need for temporary enclosures.
  • Equipment to measure and record the following:

    • Interior air temperature.
    • Relative humidity.
    • Dew point temperatures.
    • Surface temperatures of moisture-sensitive materials.
    • Standing bulk water.
  • Equipment to condition the interior work areas.

    • Heat.
    • Humidity control.
    • Ventilation.
  • Budgets sufficient to fund requirements.

Recent changes to industry standards and guidance documents discuss interior environmental condition requirements for GWB finishing. ASTM International and the Gypsum Association set two such standards.

ventilation

ASTM C840-2020

4. Environmental Conditions

4.1 Application of Gypsum Board, Joint Treatment Materials and Adhesives — Room temperature shall be maintained at not less than 40 degrees Fahrenheit (4 degrees Celsius) during application of gypsum board except when adhesive is used for the attachment of gypsum board. For the bonding of adhesive, joint treatment, texturing and decoration, the room temperature shall be maintained at not less than 50 degrees Fahrenheit (10 degrees Celsius) for 48 hours prior to application and continuously thereafter until completely dry. See X7.7 for additional detail regarding environmental control during the installation and finishing process.

X7.7 Environmental Conditions

X7.7.1 — The potential for finishing and decorating problems are minimized when temperature, humidity and airflow remain constant and as close to occupancy environmental conditions as possible. A minimum temperature of 50 degrees Fahrenheit (10 degrees Celsius) should be maintained continuously for 48 hours prior to and throughout the finishing process until applied materials are thoroughly dry.

ExactAire Smart Controller

The Gypsum Association’s GA 214- 2021

Section V has the same requirements but also states that the interior environmental conditions shall be maintained until the building is occupied.

“Environmental Control. The potential for finishing and decorating problems are minimized when temperature, humidity and airflow remain constant and as close to occupancy environmental conditions as possible. A minimum temperature of 50 degrees Fahrenheit (10 degrees Celsius) shall be maintained continuously for 48 hours prior to and throughout the finishing process until the project is completed/occupied.”

USG’s guidance document titled “Evaluating Job Site Environmental Conditions” discusses interior job site environmental conditions that contribute to thermal and hygrometric movement of GWB. USG recommends that an interior temperature of 55 degrees Fahrenheit should be maintained during the entire finishing process and until the joint compound is completely dry. USG also recommends that no joint compounds or coatings should be applied unless the surface temperature of the GWB is at least 5 degrees Fahrenheit above the dew point and that surface temperatures must be maintained above the dew point throughout the curing process.

To comply with industry requirements, the following is needed:

  • Permanent or temporary enclosure elements need to be in place. Open buildings are uncontrollable.
  • Measurements of interior environmental conditions.

    • Conditions cannot be fully understood and controlled if unmeasured and unrecorded.
    • Measurements need to be taken continuously, 24/7.
  • Ability to respond rapidly to changes in conditions by mechanically controlling interior environmental conditions.

    • Automated heat and dehumidification systems can rapidly respond to changing conditions.

Polygon, a leader in engineered, temporary climate control, operates throughout the country and Pacific Northwest. The company, previously known as Munters, pioneered the use of desiccant dehumidification more than 60 years ago, has continued to advance the industry with the latest technology and offers the most energy-efficient dehumidification and temperature control equipment available. Their team has recently developed wireless monitoring systems that continuously measure and record interior job site environmental conditions and can then transmit real-time data to a fully automated mechanical heat and dehumidification system to control conditions.

EPolygon’s Director of Engineering and Technology, David Simkins

Smart Climate Control for Job Sites

I reached out to Polygon’s Director of Engineering and Technology, David Simkins, for an update on what’s out in the field today and what might be available in the future. Contractors are faced with a plethora of options on the market to measure climate conditions. These range from simple handheld devices to off-the-shelf data loggers. Simkins explained that where Polygon’s clients are most successful is the intersection between real-time data and active environmental control.

“We have spent over 20 years developing our IoT solutions,” Simkins says. “Our model is to be sensor-agnostic: taking third-party sensors, integrating them into our platform, feeding our equipment with real information and modulating equipment exactly when it’s needed.”

Polygon breaks down a smart climate system in a few pieces:

  1. Connected sensors that continuously measure parameters like temperature, humidity, surface temperatures and dew point.
  2. User applications for data visualization, documentation and alerts.
  3. Right-size climate control equipment outfitted with a smart controller to use data and modulate interior conditions.

“This the direction of the industry,” Simkins comments. “We are constantly taking in requirements, finding sensors, demonstrating capabilities and delivering that out to our clients. It is one thing to know the conditions at a given point in time, but it is powerful when you see them holistically and can do something about it.”

Polygon recently announced the release of a new sensor that is a “Swiss army knife” of their ExactAire sensor suite. The Multi Sensor is small, flexible and able to do T/RH, leak detection, concrete or wood moisture equivalent or surface temperature. When coupled with an active equipment controller, it gives developers/owners, design teams and installing contractors 24/7 visibility and confidence in the interior environmental conditions of the working space.

Some of the ways Polygon’s clients use the data and technology include:

  • Identifying the starting point and predicting dry times.
  • Maintaining or accelerating the drying schedule.
  • Mitigating equipment performance issues that can affect installed materials.
  • Identifying if interior conditions change due to a breach in the temporary enclosure or occupant behavior (e.g. window left open).
  • Identifying problem areas and getting corrective actions in place.
  • Reducing the risk of microbial growth by maintaining proper interior conditions.
  • Documenting for all parties that proper interior environmental conditions were maintained according to the project and materials manufacturers’ requirements.

The ability to measure and record interior environmental conditions on job sites and then have the mechanical systems responding with adjustments to temperature and humidity levels in real time is a capability long overdue in construction. We expect this in our homes every day, 24/7. We should expect no less on job sites, where time is critical and costs to repair or rework materials damaged by moisture are high.

KEYWORDS: interior moisture

Share This Story

Looking for a reprint of this article?
From high-res PDFs to custom plaques, order your copy today!

Wc1123 feat nwcb p5 tools peter burns  headshot

Peter V. Burns is the director of technical services for the Northwest Wall and Ceiling Bureau. The NWCB is a nonprofit trade association for the wall and ceiling industry, serving a wide-ranging membership of contractors, manufacturers, dealers, labor organizations and other professionals in the industry.

Recommended Content

JOIN TODAY
To unlock your recommendations.

Already have an account? Sign In

  • Abercrombie & Fitch

    EIFS in 2026: How Specialty Finishes Are Redefining Exterior Wall Systems

    As building codes, owner expectations, and design demands...
    Stucco/EIFS
    By: Regi Mendoza
  • proper air and vapor control

    From Energy Efficiency to Moisture Management: Why Air and Vapor Control Matter

    How proper air and vapor control within building...
    Building Envelope
    By: Benjamin Meyer AIA, LEED AP
  • Linear Metal Ceiling Beam Baffles

    Top 25 Ceiling Contractors of 2026

    Suspended ceilings demand precision, code compliance and...
    Ceilings
    By: John Wyatt and Tanja Kern
You must login or register in order to post a comment.

Report Abusive Comment

Manage My Account
  • eMagazine Subscription
  • Newsletters
  • Online Registration
  • Manage My Preferences
  • Subscription Customer Service

More Videos

Sponsored Content

Sponsored Content is a special paid section where industry companies provide high quality, objective, non-commercial content around topics of interest to the Walls & Ceilings audience. All Sponsored Content is supplied by the advertising company and any opinions expressed in this article are those of the author and not necessarily reflect the views of Walls & Ceilings or its parent company, BNP Media. Interested in participating in our Sponsored Content section? Contact your local rep!

close
  • medical professionals moving a patient on a stretcher through the halls of a medical building
    Sponsored byNational Gypsum Company

    What Does High Performance Mean When It Comes To Gypsum Boards?

Popular Stories

Linear Metal Ceiling Beam Baffles

Top 25 Ceiling Contractors of 2026

Wichita Biomedical Campus

Wichita Drywall Worker Dies After Scaffolding Fall

QXO Just Changed the Game-Here's What Contractors Are Asking

QXO Just Changed the Game-Here's What Contractors Are Asking

Less compound

Joint Compound Market to Reach $9.7B by 2033

Events

June 24, 2026

The Bright Side & Benefits of Designing with Integrated Lighting

Credits 1 AIA LU/HSW; 0.1 ICC CEU

This course will explore the pivotal role architects and lighting design play in creating safer, more sustainable spaces. Learn how to avoid common lighting mistakes and make informed decisions that create the best visual environment for occupants. 

January 1, 2030

Webinar Sponsorship Information

For webinar sponsorship information, visit www.bnpevents.com/webinars or email webinars@bnpmedia.com.

See our full library of webinars

View All Submit An Event

Products

2026 National Painting Cost Estimator

2026 National Painting Cost Estimator

See More Products

Related Articles

  • construction safety week logo 2

    It’s a Great Time to Discuss Company Policy During Construction Safety Week

    See More
  • Inspections During Construction

    See More
  • OSHA

    OSHA Launches New Program During Construction Safety Week

    See More

Related Products

See More Products
  • Construction Spanish to English Dictionary

  • business.png

    How to Succeed With Your Own Construction Business

  • construction estimator.png

    2024 National Construction Estimator

See More Products
×

Connect with the industry’s leading resource for unparalleled insights and education.

Join thousands of industry professionals today. Shouldn’t you know what they know?

JOIN NOW
  • RESOURCES
    • Advertise
    • Contact Us
    • Directories
    • Store
    • Want More
  • SIGN UP TODAY
    • Create Account
    • eMagazine
    • Newsletters
    • Customer Service
    • Manage Preferences
  • SERVICES
    • Marketing Services
    • Reprints
    • Market Research
    • List Rental
    • Survey/Respondent Access
  • STAY CONNECTED
    • LinkedIn
    • Facebook
    • Instagram
    • YouTube
    • X
  • PRIVACY
    • PRIVACY POLICY
    • TERMS & CONDITIONS
    • DO NOT SELL MY PERSONAL INFORMATION
    • PRIVACY REQUEST
    • ACCESSIBILITY

Copyright ©2026. All Rights Reserved BNP Media, Inc. and BNP Media II, LLC.

Design, CMS, Hosting & Web Development :: ePublishing