Walls & Ceilings logo
search
cart
facebook twitter linkedin youtube youtube Spotify Podcasts Apple Podcasts Spotify Podcasts Apple Podcasts
  • Sign In
  • Create Account
  • Sign Out
  • My Account
Walls & Ceilings logo
  • NEWS
  • TOPICS
    • Drywall
    • Stucco/EIFS
    • Ceilings
    • Steel Framing
    • Fireproofing
    • Interior Plaster
    • Building Envelope
    • Insulation
    • Technology
    • Interior
    • Exterior
    • Women In Construction
  • COLUMNS
    • Up Front
    • All Things Gypsum
    • Art & Craft of Plastering
    • Stucco Stop
    • Steel Deal
    • Industry Voices
  • PRODUCTS
    • Buzz Guide
  • EVENTS
    • Industry Events
    • Webinars
    • BUILD Expo
  • MEDIA
    • Videos
    • Podcasts
    • Photo Galleries
    • BUILD26 Videos
    • Take our Quiz!
    • Infographics
  • EXCLUSIVE
    • Newsletters
    • Top 50 Contractors
    • Contractor of the Year
    • State of the Industry
    • W&C Store
    • Market Research
    • CEUs
    • Sponsor Insights
    • Custom Content & Marketing Services
  • DIRECTORY
  • EMAGAZINE
    • eMagazine
    • Advertise
    • Archive Issues
  • SIGN UP!
Exterior

Five Strategies to Improve Curtainwall Glazing Efficiency on Complex Projects

Five practical strategies for coordinating curtain wall glazing—from delivery logistics to anchor tolerances.

By Chuck Knickerbocker
Curtainwall Glazing Efficiency on Complex Projects
Technical Glass Products
April 14, 2026

Oklahoma City’s Will Rogers World Airport includes a segmented exterior glass curtain wall representing some of the largest glazing work installed by Avenue C Glass, the contract glazier. Mike Marlin, project manager at Avenue C Glass, explains, “The bow, stainless-steel frames and large spans—all of it was a leap forward for us.”

By taking a coordinated and collaborative approach, Avenue C Glass ensured the glazing systems were planned and installed according to the design intent. The result demonstrates both the scale of the curtain wall and the intricacy of its installation.

For project teams, understanding logistics, anchoring and sealing protocols—and the processes behind complex glazing assemblies—can improve installation efficiency and project outcomes. The following tips provide a starting point for improving jobsite coordination and installation of complex glazing systems.

1. Strategize for Feasible Delivery Schedules

Delivery timelines are critical to ensuring curtain wall projects proceed smoothly. Proper planning can also help glazing subcontractors streamline installation while reducing glass damage and jobsite congestion.

Whether a project uses prefabricated curtain wall units or field-assembled systems, the site must provide adequate laydown space and access for equipment required to place curtain wall components. Both assembly types therefore require coordination with other trades and construction phases to maintain workable site conditions.

Manufacturer lead times also influence scheduling. Collaborating with a trusted manufacturer can help project teams establish realistic timelines.

Ideally, glazing subcontractors coordinate with general contractors during the proposal phase to outline installation requirements. After contract award, teams can finalize material delivery and installation schedules. This approach reduces the risk of damaged components and simplifies jobsite logistics, allowing the general contractor to plan concurrent work and manage the return of floor space for other trades.

An airport terminal

Photo: Technical Glass Products

2. Mind Anchors and Sealants

Understanding permissible anchoring systems is critical because anchors connect the curtain wall assembly to the building structure. Simplifying anchor design wherever possible can significantly reduce field installation costs, although feasibility depends on the specific assembly and structural interface.

Most anchors are designed with adjustability to accommodate installation tolerances. Specifications commonly allow approximately 1 inch of adjustment in all directions—in/out, left/right and up/down—from nominal position.

Stick-built systems typically use simpler anchoring methods, often consisting of anchor clips attached to vertical mullions and connected to embeds or welded structural elements. Contractors should verify anchoring systems and allowable tolerances with both manufacturers and engineering teams before installation begins.

Project teams should also clarify responsibility when anchor conditions fall outside allowable tolerances. Additional engineering and fabrication may be required to design modified anchor components to accommodate “as-built” conditions. Depending on the situation, these changes can exceed $2,000 and add about a week to the schedule—highlighting the importance of constructing the structure within the specified ±1-inch tolerance.

Sealants are equally critical to glazing performance. Assemblies must be installed according to manufacturer product literature, including ensuring clean, dry substrates and verifying that weather conditions allow proper curing.

Sealants typically maintain the air- and water-resistance lines between the glazing system and adjacent construction. They also accommodate movement caused by wind loads, thermal expansion and contraction, and structural deflection. 

Undersized joints can lead to leaks, while oversized joints increase installation time and material use. Installation manuals include detailed instructions for internal sealing, gasket placement, compartmentalizing glazing pockets, sealing pressure plates and directing water paths to the exterior. Installing a system without following these requirements—or correcting sealant work contrary to manufacturer instructions—may void the manufacturer’s warranty.

An Audi dealership

Photo: Technical Glass Products

3. Understand Requirements for Fire- and Security-Rated Glazing

Specialty glazing assemblies—including fire-rated and security-rated systems—require additional attention during installation to ensure performance in emergency conditions.

Improper installation of fire-rated glazing can create life-safety risks and may prevent a building from receiving a certificate of occupancy, delaying project completion and increasing costs.

Glazing subcontractors should verify that all components share compatible ratings. A fire-rated glazing assembly can only perform to the level of its least protective component. This includes glass lites, framing members, anchors and their attachment points, door frames and hardware.

Context within the building is also important. For example, two assemblies may both carry 60-minute fire ratings but one may serve as a fire barrier while the other functions as a fire partition. Each system is anchored differently based on its tested configuration, and components generally cannot be substituted between systems without engineering review.

Fire-rated and security-rated glass products are also heavier than standard glazing, requiring stronger framing systems or closer mullion spacing to maintain structural performance.

Wood framing

Photo: Technical Glass Products

4. Consider the Entire Planning and Construction Process

Field conditions rarely match project models exactly. Variations in concrete, framing or structural dimensions can introduce challenges that affect glazing installation.

For example, long runs of floor-to-ceiling glazing may experience significant installation difficulties if small variations occur in slab elevations. Even minor deviations can compound across large spans.

When these issues arise, field teams must troubleshoot quickly to avoid schedule impacts. Efficient problem-solving helps prevent delays that can ripple through punch list completion and project turnover.

Involving manufacturers early in the planning and construction process can help project teams anticipate potential issues. Manufacturer technical teams understand the limits of their assemblies and often have experience with similar installations.

Their insight can help design teams refine system details while supporting field crews in resolving jobsite challenges. Early collaboration also helps ensure ambitious architectural designs remain achievable within real-world construction constraints.

5. Collaborate to Find Efficiencies

Collaboration typically begins when the architect and general contractor engage a glazing subcontractor to help execute the design within budget. This process often takes the form of design assist, which involves coordination among architects, contractors, manufacturers and installation crews.

Early involvement of field crews and manufacturer engineering teams allows projects to identify design and fabrication efficiencies before construction begins. Nearly every aspect of a glazing project—from fabrication to installation sequencing—can potentially be improved through collaborative planning.

For custom projects in particular, efficiencies often emerge through dialogue among teams. Installation crews may identify practical improvements that influence estimating, procurement or fabrication decisions.

Glazing subcontractors ultimately connect design and engineering teams with building occupants and end users. Successfully executing complex façade systems not only supports architectural ambitions but can also expand the capabilities of glazing crews and contractors.

Reflecting on the work at Will Rogers World Airport, Marlin emphasizes that sense of accomplishment: “The scale of these systems is impressive. It’s some of the biggest glazing work we’ve done. The curtain walls were satisfying to install.”

KEYWORDS: airport curtain wall fenestration glass glazing Oklahoma project management WRB (weather resistant barrier)

Share This Story

Looking for a reprint of this article?
From high-res PDFs to custom plaques, order your copy today!

Wc1225 feat curtainwall author chuck knickerbocker headshot
Chuck Knickerbocker is the curtain wall manager for Technical Glass Products, a supplier of fire-rated glass and framing systems, along with specialty architectural glazing products. With over 44 years of curtain wall experience, Chuck has successfully worked with numerous architects, building owners and subcontractors from development of schematic design through installation.

Recommended Content

JOIN TODAY
To unlock your recommendations.

Already have an account? Sign In

  • Abercrombie & Fitch

    EIFS in 2026: How Specialty Finishes Are Redefining Exterior Wall Systems

    As building codes, owner expectations, and design demands...
    Stucco/EIFS
    By: Regi Mendoza
  • proper air and vapor control

    From Energy Efficiency to Moisture Management: Why Air and Vapor Control Matter

    How proper air and vapor control within building...
    Building Envelope
    By: Benjamin Meyer AIA, LEED AP
  • Linear Metal Ceiling Beam Baffles

    Top 25 Ceiling Contractors of 2026

    Suspended ceilings demand precision, code compliance and...
    Ceilings
    By: John Wyatt and Tanja Kern
You must login or register in order to post a comment.

Report Abusive Comment

Manage My Account
  • eMagazine Subscription
  • Newsletters
  • Online Registration
  • Manage My Preferences
  • Subscription Customer Service

More Videos

Sponsored Content

Sponsored Content is a special paid section where industry companies provide high quality, objective, non-commercial content around topics of interest to the Walls & Ceilings audience. All Sponsored Content is supplied by the advertising company and any opinions expressed in this article are those of the author and not necessarily reflect the views of Walls & Ceilings or its parent company, BNP Media. Interested in participating in our Sponsored Content section? Contact your local rep!

close
  • medical professionals moving a patient on a stretcher through the halls of a medical building
    Sponsored byNational Gypsum Company

    What Does High Performance Mean When It Comes To Gypsum Boards?

Popular Stories

Wichita Biomedical Campus

Wichita Drywall Worker Dies After Scaffolding Fall

Okan Tower in Miami, Florida

OSHA Opens Investigation Into Fatal Okan Tower Column Collapse

Construction workers in safety vests install drywall

Gypsum Sales Hold Amid Market Shifts in the U.S.

data center and logos

USG, Subzero Engineering Form Data Center Alliance

Events

June 24, 2026

The Bright Side & Benefits of Designing with Integrated Lighting

Credits 1 AIA LU/HSW; 0.1 ICC CEU

This course will explore the pivotal role architects and lighting design play in creating safer, more sustainable spaces. Learn how to avoid common lighting mistakes and make informed decisions that create the best visual environment for occupants. 

January 1, 2030

Webinar Sponsorship Information

For webinar sponsorship information, visit www.bnpevents.com/webinars or email webinars@bnpmedia.com.

See our full library of webinars

View All Submit An Event

Products

2026 National Painting Cost Estimator

2026 National Painting Cost Estimator

See More Products

Related Articles

  • ICC logo

    Louisiana Clears Bill to Improve Energy Efficiency Codes Statewide

    See More
  • construction technology

    Embracing Technology to Improve Labor Crunch in the Construction Industry

    See More
  • national fire safety week.jpg

    Owens Corning Spotlights Strategies to Support Life Safety in Commercial Buildings

    See More

Related Products

See More Products
  • 0470872616.jpg

    Sustainable Renovation: Strategies for Commercial Building Systems and Envelope

  • Accidents Waiting to Happen: Best Practices in Workers' Comp Administration and Protecting Corporate Profitability

  • Construction Spanish to English Dictionary

See More Products

Related Directories

  • Fenestration and Glazing Industry Alliance (FGIA)

    The Fenestration and Glazing Industry Alliance (FGIA) is dedicated to improving home and building performance through better glass, window, door and skylight technology and standards.
×

Connect with the industry’s leading resource for unparalleled insights and education.

Join thousands of industry professionals today. Shouldn’t you know what they know?

JOIN NOW
  • RESOURCES
    • Advertise
    • Contact Us
    • Directories
    • Store
    • Want More
  • SIGN UP TODAY
    • Create Account
    • eMagazine
    • Newsletters
    • Customer Service
    • Manage Preferences
  • SERVICES
    • Marketing Services
    • Reprints
    • Market Research
    • List Rental
    • Survey/Respondent Access
  • STAY CONNECTED
    • LinkedIn
    • Facebook
    • Instagram
    • YouTube
    • X
  • PRIVACY
    • PRIVACY POLICY
    • TERMS & CONDITIONS
    • DO NOT SELL MY PERSONAL INFORMATION
    • PRIVACY REQUEST
    • ACCESSIBILITY

Copyright ©2026. All Rights Reserved BNP Media, Inc. and BNP Media II, LLC.

Design, CMS, Hosting & Web Development :: ePublishing