Walls & Ceilings logo
search
cart
facebook twitter linkedin youtube youtube Spotify Podcasts Apple Podcasts Spotify Podcasts Apple Podcasts
  • Sign In
  • Create Account
  • Sign Out
  • My Account
Walls & Ceilings logo
  • NEWS
  • TOPICS
    • Drywall
    • Stucco/EIFS
    • Ceilings
    • Steel Framing
    • Fireproofing
    • Interior Plaster
    • Building Envelope
    • Insulation
    • Technology
    • Interior
    • Exterior
    • Women In Construction
  • COLUMNS
    • Up Front
    • All Things Gypsum
    • Art & Craft of Plastering
    • Stucco Stop
    • Steel Deal
    • Industry Voices
  • PRODUCTS
    • Buzz Guide
  • EVENTS
    • Industry Events
    • Webinars
    • BUILD Expo
  • MEDIA
    • Videos
    • Podcasts
    • Photo Galleries
    • BUILD26 Videos
    • Take our Quiz!
    • Infographics
  • EXCLUSIVE
    • Newsletters
    • Top 50 Contractors
    • Contractor of the Year
    • State of the Industry
    • W&C Store
    • Market Research
    • CEUs
    • Sponsor Insights
    • Custom Content & Marketing Services
  • DIRECTORY
  • EMAGAZINE
    • eMagazine
    • Advertise
    • Archive Issues
  • SIGN UP!
Columns

All Things Gypsum
Cold Weather Application

By Michael Gardner
January 1, 2004
During the winter, every state in the continental U.S. and Canada will experience at least one night of below freezing temperature. Even warm-weather states like Florida encounter a few nights where temperatures become sufficiently low to create frost or to freeze external water sources.

Cold and damp weather conditions can have negative effects on freshly applied joint treatment and gypsum board, such as joint compound bond, delayed shrinkage, beading, nail popping, and board sag; all of which can affect the overall appearance of the system. Although extreme environmental conditions have little effect on the process of applying gypsum board, special procedures or precautions should be observed during the application and drying of joint treatments and adhesives. When weather conditions are cold and wet, the drying times of joint treatment materials are affected. Cold temperatures slow drying and increase the risk of freezing; wet weather also delays drying.

Joint treatment materials should not be applied when surfaces are cold or damp. The temperature of the building or the area where the joint treatment material is being applied should be maintained at no less than 50 degrees F (10 degrees C) for no less than 48 hours before and continuously thereafter, until applied materials are thoroughly dry. The same temperature criteria should be maintained if joint treatment materials are being used for laminating one layer of board to a monolithic surface or to another layer of board.

Cold and damp

The effect of cold and damp conditions on the drying time of joint compound under joint tape can readily be determined by examining the accompanying drying timetable. It is commonly acknowledged that hot, humid conditions-a temperature of 90 degrees F (32 degrees C) and a relative humidity of 90 percent, for example-will extend the drying time of joint treatment materials; however, it is not as apparent that cold, dry conditions also impact the same process. As an example, the table shows an identical extended drying time of 34 hours for two completely different conditions: 40 degrees F (4 degrees C) with 20 percent relative humidity and 80 degrees F (27 degrees C) with 80 percent relative humidity; these are typical winter and summer working conditions for many parts of the U.S. and Canada.

It is imperative that each coat of joint compound be thoroughly dry prior to the application of subsequent finishing and texturing materials. Materials should be applied in accordance with the manufacturer's instructions. A heavy application of compound or texture that will lengthen the drying time should be avoided.

The use of temporary heat systems to artificially increase the temperature of a working area should be accomplished judiciously. When a temporary heat source is used, the temperature in the artificially heated area should not exceed 95 degrees F (35 degrees C). Heaters should not be allowed to blow directly on wall surfaces as excessive local heat can cause joint compound to dry too rapidly resulting in localized cracking and delamination. In addition, some temporary heaters introduce large amounts of water vapor into the air and can cause high humidity conditions if the work area is not properly ventilated. Humidity conditions should be monitored to determine the impact on overall drying time. Areas using temporary heat systems should be well ventilated to prevent the build-up of fumes. Caution should be exercised when relocating heaters or heat sources.

Water-based joint treatment materials, such as ready-mixed joint compounds, should be protected against freezing while in storage. Partially frozen joint compound can be used as a bedding and second coat material, after it is allowed to thaw naturally and if it is thoroughly mixed prior to use. Previously frozen compound should never be used as a finish coat or topping material. Setting-type joint treatment materials provide an excellent alternative to canned or boxed joint compounds during cold weather as they can be stored in cold conditions and mixed at the job site. Water temperature should be closely monitored during the mixing process. Materials should not be mixed using extremely cold or partially frozen water.

Adhesion

Adhesives used for the application of gypsum board should be applied in accordance with manufacturers' instructions for temperature and climactic conditions. In general, adhesive application of interior gypsum board should be accomplished only when working area temperatures have been maintained at 50 degrees F (10 degrees C). Adhesives should be stored with conditions identical to those used with joint compounds as some adhesive materials can freeze. Previously frozen adhesive should be used only after discussion with the adhesive manufacturer.

Winter weather also introduces the possibility of snow, sleet, and rain storms. To prevent damage to gypsum board, it should be stored in a location where it is protected from moisture and properly supported above the ground. Board should not be enclosed in plastic shipping bags during storage. Plastic shipping bags are intended to provide protection during transit only and must be promptly removed upon arrival of the load. Failure to remove the shipping bag can increase the likelihood of developing conditions favorable to the growth of mold.

Care must also be exercised during cold weather installation of insulation to minimize the possibility of sag on interior ceilings and other horizontal soffit areas. When a polyethylene vapor retarder is installed on ceilings behind gypsum board, it is important to install batt or blanket ceiling insulation before the gypsum board is installed. When loose-fill insulation is used, the insulation should be installed immediately after the ceiling board is applied, but before the wallboard joints are taped or any other wet finishing operation has begun on the ceiling or adjacent walls. Failure to follow these procedures creates a potential for moisture condensation on the backside of the gypsum board.

Preventive measures designed to compensate for or minimize the effects of weather extremes can avert a potential problem. Preventive measures amount to little more than the conscientious observance of some common sense practices. Special attention to maintaining recommended environmental conditions before, during, and after applications of gypsum board and joint treatment materials are important factors in minimizing the effects of extreme weather conditions. Extreme weather conditions are less forgiving when good practices are not followed.

Share This Story

Looking for a reprint of this article?
From high-res PDFs to custom plaques, order your copy today!

Michael Gardner is the president of M Gardner Services LLC, a consulting firm that assists organizations with issues involving industry standards and building codes, meeting management, and external collaboration and outreach. Prior to establishing MGS, he was the executive vice president of Compliance Programs for the International Code Council. He is also the former CEO of the Gypsum Association, currently serves as a special technical advisor to the Wall & Ceiling Alliance and can be reached at michael@mgardnerservices.com.

Recommended Content

JOIN TODAY
To unlock your recommendations.

Already have an account? Sign In

  • Abercrombie & Fitch

    EIFS in 2026: How Specialty Finishes Are Redefining Exterior Wall Systems

    As building codes, owner expectations, and design demands...
    Stucco/EIFS
    By: Regi Mendoza
  • proper air and vapor control

    From Energy Efficiency to Moisture Management: Why Air and Vapor Control Matter

    How proper air and vapor control within building...
    Building Envelope
    By: Benjamin Meyer AIA, LEED AP
  • Linear Metal Ceiling Beam Baffles

    Top 25 Ceiling Contractors of 2026

    Suspended ceilings demand precision, code compliance and...
    Ceilings
    By: John Wyatt and Tanja Kern
You must login or register in order to post a comment.

Report Abusive Comment

Manage My Account
  • eMagazine Subscription
  • Newsletters
  • Online Registration
  • Manage My Preferences
  • Subscription Customer Service

More Videos

Sponsored Content

Sponsored Content is a special paid section where industry companies provide high quality, objective, non-commercial content around topics of interest to the Walls & Ceilings audience. All Sponsored Content is supplied by the advertising company and any opinions expressed in this article are those of the author and not necessarily reflect the views of Walls & Ceilings or its parent company, BNP Media. Interested in participating in our Sponsored Content section? Contact your local rep!

close
  • medical professionals moving a patient on a stretcher through the halls of a medical building
    Sponsored byNational Gypsum Company

    What Does High Performance Mean When It Comes To Gypsum Boards?

Popular Stories

drywall contractor sanding ceiling

D.C. Drywall Contractors to Pay $302K in Worker Case

Wichita Biomedical Campus

Wichita Drywall Worker Dies After Scaffolding Fall

Okan Tower in Miami, Florida

OSHA Opens Investigation Into Fatal Okan Tower Column Collapse

data center and logos

USG, Subzero Engineering Form Data Center Alliance

Events

January 1, 2030

Webinar Sponsorship Information

For webinar sponsorship information, visit www.bnpevents.com/webinars or email webinars@bnpmedia.com.

See our full library of webinars

View All Submit An Event

Products

2026 National Painting Cost Estimator

2026 National Painting Cost Estimator

See More Products

Related Articles

  • All things Gypsum: Application of Gypsum Panel

    See More
  • All Things Gypsum: Attachment of Gypsum Board

    See More
  • All Things Gypsum: How Big is a 2x4?

    See More

Related Products

See More Products
  • 2021 ibc.jpeg

    2021 International Building Code® Illustrated Handbook

See More Products

Related Directories

  • All-Wall

  • Cold-Formed Steel Engineers Institute

×

Connect with the industry’s leading resource for unparalleled insights and education.

Join thousands of industry professionals today. Shouldn’t you know what they know?

JOIN NOW
  • RESOURCES
    • Advertise
    • Contact Us
    • Directories
    • Store
    • Want More
  • SIGN UP TODAY
    • Create Account
    • eMagazine
    • Newsletters
    • Customer Service
    • Manage Preferences
  • SERVICES
    • Marketing Services
    • Reprints
    • Market Research
    • List Rental
    • Survey/Respondent Access
  • STAY CONNECTED
    • LinkedIn
    • Facebook
    • Instagram
    • YouTube
    • X
  • PRIVACY
    • PRIVACY POLICY
    • TERMS & CONDITIONS
    • DO NOT SELL MY PERSONAL INFORMATION
    • PRIVACY REQUEST
    • ACCESSIBILITY

Copyright ©2026. All Rights Reserved BNP Media, Inc. and BNP Media II, LLC.

Design, CMS, Hosting & Web Development :: ePublishing