Huntsman Building Solutions' D-Max Wall Continuous Insulation Solution
New Assembly Allows Installation of HEATLOK HFO Spray Foam from Interior
Huntsman Building Solutions introduced D-Max Wall, a new assembly and continuous insulation solution which allows spray polyurethane foam insulation to be installed from the interior while managing thermal bridging of the studs and structure. The assembly utilizes HEATLOK HFO, with the closed cell spray foam insulation providing three key functions, acting as insulation, air barrier and vapor barrier in a single product application. The new wall assembly eliminates construction delays caused by inclement weather conditions, allowing contractors to continue installation during cold winter months.
“Among D-Max Wall’s biggest benefits is the spray foam insulation may be installed regardless of temperature or wind variables and as the walls are built, saving valuable time and maximizing speed to completion,” says Doug Brady, vice president of global innovation and product management with Huntsman Building Solutions. “The assembly also provides significant heating savings during winter construction activity.”