Q. On a recent project, we installed steel studs to the underside of the grid system for a suspended acoustical ceiling. I used screws to attach the runner track to the ceiling grid. I then installed my “kickers,” or permanent bracing to the structure above. I was then told to go back and remove all the temporary screws to allow the ceiling to float. Why?