Walls & Ceilings logo
search
cart
facebook twitter linkedin youtube youtube Spotify Podcasts Apple Podcasts Spotify Podcasts Apple Podcasts
  • Sign In
  • Create Account
  • Sign Out
  • My Account
Walls & Ceilings logo
  • NEWS
  • TOPICS
    • Drywall
    • Stucco/EIFS
    • Ceilings
    • Steel Framing
    • Fireproofing
    • Interior Plaster
    • Building Envelope
    • Insulation
    • Technology
    • Interior
    • Exterior
    • Women In Construction
  • COLUMNS
    • Up Front
    • All Things Gypsum
    • Art & Craft of Plastering
    • Stucco Stop
    • Steel Deal
    • Industry Voices
  • PRODUCTS
    • Buzz Guide
  • EVENTS
    • Industry Events
    • Webinars
    • BUILD Expo
  • MEDIA
    • Videos
    • Podcasts
    • Photo Galleries
    • BUILD26 Videos
    • Take our Quiz!
    • Infographics
  • EXCLUSIVE
    • Newsletters
    • Top 50 Contractors
    • Contractor of the Year
    • State of the Industry
    • W&C Store
    • Market Research
    • CEUs
    • Sponsor Insights
    • Custom Content & Marketing Services
  • DIRECTORY
  • EMAGAZINE
    • eMagazine
    • Advertise
    • Archive Issues
  • SIGN UP!

The Hardest Part of My Transition

By Matt Chila
June 24, 2014

I’m often asked, “What is the hardest part of your transition into selling plaster?”

By far, the hardest thing for me is convincing contractors there is a different way to go about doing something they have done a certain way for, at times, over 30 years. They have done it a particular way, their fathers and even their grandfathers have all applied scratch and brown coats with a field mix application, so why change?

There are many reasons to consider using pre-blended plaster, but keep in mind that pre-blended is not going to be cheaper in initial material costs than mixing a sand pile and cement, but it is also not going to be as expensive as many think it is.

Like I said, initial material costs are always going to favor the sand pile and cement. These are some of the obstacles or challenges that need to be on the minds of plasterers and/or business owner regarding field mixing:

  • Quality and consistency of my sand source
  • Do I have room to drop a sand pile on this job or is space tight?
  • What are my actual costs per yard of scratch and brown on the wall? (NOT what I think they are but actually looking into ALL my costs associated with a sand pile.)

·  How many guys are in the pile?

·  How much sand do I pay for that I don’t use? With the left over sand, am I responsible for clean up? If so, how much does that cost me?

  • If you don’t need a full load of sand, is there a short load cost?
  • Who does the quality control on my jobsite?

·  When field mixing, the person controlling the quality of my mix is the person that is shoveling the sand into the mixer. How many shovels go into each batch? Is it the same every time? If the sand pile is wet today, are the shovels the same as when the pile was dry yesterday? If they are not the same, what does that mean to my finished product?

  • If cracking issues are to arise, do I have the backing or support from my cement or sand supplier? If not, where does that leave the liability of each job?
  • Have I ever received a workers compensation claim from my hod carrier with injuries associated with shoveling movements? If so, how much did that cost me?

When taking into consideration all the aspects above it starts to become clear to most contractors I speak with that realize pre-blended is a great alternative to what they have been doing in past years, take into consideration that pre-blended products offer the following:

  • Sand that is consistent and of high quality.

·  Sand that is brought into a manufacturing facility that is dried and sieved to meet ASTM C-897 specifications.

  • Ability to work on large projects in small spaces.

·  Utilizing a silo system allows the contractors to maximized job site staging areas.

  • Your costs per yard are comparable and within reason to a sand pile.

·  No wasted material left on the ground or paying for materials that are not going to be used. Whatever isn’t used simply moves to the next job.

·  One person can man that sand pile. If you are used to that, then nothing changes. However, if you would have two guys then you can reallocate the second to increase production and/or move him to another jobsite to save money.

·  Since the sand is dried, you are getting increased yield per batch which, again, this will increase production and decrease shrinkage cracking allowing you to not have to do as much patch work.

  • With all the raw materials being blended and bagged at a manufacturing plant, the quality control becomes much more detailed and takes out many of the variables that can cause issues on-site. The only thing the hod carrier has to do is JUST ADD WATER!
  • You now have an organization that will stand by its product and back you to support you with any product malfunctions. This shifts some of the liability away from you and onto the manufacturer.
  • Minimize on-site injury risks by condensing the amount of twisting and turning a hod carrier would do.
  • Single source warranty with finish manufacturers.

As you can see, convincing someone to look at what they are doing and have done for many years in a different light, is very detailed and not an easy thing to do. Once the contractors begin to look at all aspects of their job, most begin to see that they can/will save money in other areas other than up front material costs. These savings, decreased liabilities and overall quality of the finished walls make pre-blended products much more affordable and attractive than most contractors think!

KEYWORDS: Quikrete

Share This Story

Matt is the Southern California stucco rep for The Quikrete Companies. He can be reached at (951) 264-2489 or mchila@quikrete.com.
You must login or register in order to post a comment.

Report Abusive Comment

Blog Topics

Living Sustainable

A Day in the Life

Racing the Tide

On your mark, get set, go!

Tool Talk

Something to Consider

The Trowel Talk

Finish Line

Job Site Tech

Recent Comments

I appreciate the deep dive into the trickle-down...

The emphasis on measurable outcomes really resonates with...

I appreciate the insightful connections you drew between...

Really interesting perspective on how small business optimism...

The part about the 1 percent increase per...

Manage My Account
  • eMagazine Subscription
  • Newsletters
  • Online Registration
  • Manage My Preferences
  • Subscription Customer Service

More Videos

Sponsored Content

Sponsored Content is a special paid section where industry companies provide high quality, objective, non-commercial content around topics of interest to the Walls & Ceilings audience. All Sponsored Content is supplied by the advertising company and any opinions expressed in this article are those of the author and not necessarily reflect the views of Walls & Ceilings or its parent company, BNP Media. Interested in participating in our Sponsored Content section? Contact your local rep!

close
  • medical professionals moving a patient on a stretcher through the halls of a medical building
    Sponsored byNational Gypsum Company

    What Does High Performance Mean When It Comes To Gypsum Boards?

Popular Stories

Linear Metal Ceiling Beam Baffles

Top 25 Ceiling Contractors of 2026

Wichita Biomedical Campus

Wichita Drywall Worker Dies After Scaffolding Fall

QXO Just Changed the Game-Here's What Contractors Are Asking

QXO Just Changed the Game-Here's What Contractors Are Asking

An interior drywalling work in progress

Boost Profits with AI Scheduling

Events

June 24, 2026

The Bright Side & Benefits of Designing with Integrated Lighting

Credits 1 AIA LU/HSW; 0.1 ICC CEU

This course will explore the pivotal role architects and lighting design play in creating safer, more sustainable spaces. Learn how to avoid common lighting mistakes and make informed decisions that create the best visual environment for occupants. 

January 1, 2030

Webinar Sponsorship Information

For webinar sponsorship information, visit www.bnpevents.com/webinars or email webinars@bnpmedia.com.

See our full library of webinars

View All Submit An Event

Products

2026 National Painting Cost Estimator

2026 National Painting Cost Estimator

See More Products
×

Connect with the industry’s leading resource for unparalleled insights and education.

Join thousands of industry professionals today. Shouldn’t you know what they know?

JOIN NOW
  • RESOURCES
    • Advertise
    • Contact Us
    • Directories
    • Store
    • Want More
  • SIGN UP TODAY
    • Create Account
    • eMagazine
    • Newsletters
    • Customer Service
    • Manage Preferences
  • SERVICES
    • Marketing Services
    • Reprints
    • Market Research
    • List Rental
    • Survey/Respondent Access
  • STAY CONNECTED
    • LinkedIn
    • Facebook
    • Instagram
    • YouTube
    • X
  • PRIVACY
    • PRIVACY POLICY
    • TERMS & CONDITIONS
    • DO NOT SELL MY PERSONAL INFORMATION
    • PRIVACY REQUEST
    • ACCESSIBILITY

Copyright ©2026. All Rights Reserved BNP Media, Inc. and BNP Media II, LLC.

Design, CMS, Hosting & Web Development :: ePublishing