Walls & Ceilings logo
search
cart
facebook twitter linkedin youtube youtube Spotify Podcasts Apple Podcasts Spotify Podcasts Apple Podcasts
  • Sign In
  • Create Account
  • Sign Out
  • My Account
Walls & Ceilings logo
  • NEWS
  • TOPICS
    • Drywall
    • Stucco/EIFS
    • Ceilings
    • Steel Framing
    • Fireproofing
    • Interior Plaster
    • Building Envelope
    • Insulation
    • Technology
    • Interior
    • Exterior
    • Women In Construction
  • COLUMNS
    • Up Front
    • All Things Gypsum
    • Art & Craft of Plastering
    • Stucco Stop
    • Steel Deal
    • Industry Voices
  • PRODUCTS
    • Buzz Guide
  • EVENTS
    • Industry Events
    • Webinars
    • BUILD Expo
  • MEDIA
    • Videos
    • Podcasts
    • Photo Galleries
    • BUILD26 Videos
    • Take our Quiz!
    • Infographics
  • EXCLUSIVE
    • Newsletters
    • Top 50 Contractors
    • Contractor of the Year
    • State of the Industry
    • W&C Store
    • Market Research
    • CEUs
    • Sponsor Insights
    • Custom Content & Marketing Services
  • DIRECTORY
  • EMAGAZINE
    • eMagazine
    • Advertise
    • Archive Issues
  • SIGN UP!
Building EnvelopeDrywallInsulation

Hotel Construction Accelerates with Super Bowl Approach

Super Speed for the Super Bowl

Mystic Lake Casino Hotel

NFL Championship game-fueled construction in Twin Cities relies on “special teams” to accelerate construction of Mystic Lake Casino Hotel and Convention Center Expansion.

Mystic Lake Casino Hotel

NFL Championship game-fueled construction in Twin Cities relies on “special teams” to accelerate construction of Mystic Lake Casino Hotel and Convention Center Expansion.

Mystic Lake Casino Hotel

NFL Championship game-fueled construction in Twin Cities relies on “special teams” to accelerate construction of Mystic Lake Casino Hotel and Convention Center Expansion.

Mystic Lake Casino Hotel
Mystic Lake Casino Hotel
Mystic Lake Casino Hotel
February 3, 2018

In May 2014, The NFL announced that its 52nd championship game would be played in Minneapolis in 2018. From there, the race was on within the hospitality, commercial real estate and construction industries in the Twin Cities to capitalize on the future economic infusion from the big game. 

Now, with the NFL championship game around the corner, the final push is on to complete construction of new restaurants and hotels to accommodate the influx of football fans and the throng of media attending the big game. 

The Game Plan

One of the largest NFL championship-fueled projects was the expansion of the Mystic Lake Casino Hotel that involved construction of Mystic Lake Center, a new 180 room, 12-story hotel tower connected to a 70,000-square-foot convention center. The looming deadline imposed by the championship game compressed the timeline for design, permitting and construction of the project and placed a premium on creative approaches.

“We needed what I like to call our own ‘special teams’ unit to enable us to complete the project in time for the big game,” says Isaac Kendall, project superintendent with PCL Construction Services, Inc.’s Minneapolis district who is also the general contractor of the Mystic Lake Center expansion project.  

For any large-scale construction project, one of the best ways to accelerate construction is to complete the shell of the building as soon as possible so the facility can become weather tight to allow interior work to begin. The design called for use of an EIF system. This continuous insulation system is among the most widely used exterior cladding materials in commercial construction.   

Many prominent buildings in Minneapolis have exterior walls built with EIFS, including the Mall of America and countless hotels.

PCL turned to Swanson & Youngdale, a 70-year-old Minnesota contractor specializing in EIFS construction, to assess options on the fastest and most effective way to construct the building envelope.    

Most Valuable Panels

Kevin Halvorson, vice president of Swanson & Youngdale’s drywall division, showed PCL how if they used pre-fabricated EIFS panels that were built in a weather-controlled environment, off-site and brought to the construction site for faster installation, they could cut months off the construction timeline. 

Halvorson was confident in his company’s ability to meet the tight timeframe due to his partnership with the Lutz Company, a Minneapolis-based company that distributes EIFS components for Dryvit Systems, Inc.

PCL and the Mystic Lake Casino Hotel team did their homework before giving a greenlight to the plan for pre-fabricated panels at Mystic Lake Center. “We had other companies build panels before for other jobs but never in as complicated a design,” says Kendall. “The Mystic Lake project required floor to ceiling panels that incorporated the windows. We didn’t want to give up quality that I knew we could count on with traditional field applied EIFS but we also knew that we didn’t have the luxury of time to use the traditional approach on the entire project.”

To assure PCL that the pre-fabricated approach would provide the same quality as field applied EIFS, yet in a fraction of the time, Swanson & Youngdale worked with the Lutz Co. to develop a full section of exterior cladding with an integrated window system. After seeing the wall section, PCL was convinced. Then, the completed section was shown to the design team and owner, both of whom signed off on the accelerated construction approach. 

Game Time

It took just 37 working days for a five-man crew to install 30,000 square feet of panels on the 12-story hotel tower. For the 70,000-square-foot convention center, where traditional field applied EIFS had to be used because of a curved wall design, ten workers spent five months completing the job. 

“I was amazed at how fast the panels of EIFS were installed on the hotel tower,” says Kendall. “Speed wasn’t the only major benefit of this approach. If we had gone the conventional way with field applied EIFS on the hotel tower, we wouldn’t have been able to install the windows until all of the EIFS was completed and the scaffolding was down. Thanks to panelization, as soon as the installation crew completed a section, I could have a caulking team come right behind them to secure the windows in place. Having multiple trades working on the project at the same time was a huge time saver.”

Halvorson estimates that the use of pre-fabricated panels shaved six months off the construction timeline. Tim Lutz knows he’ll be watching the big game on February 4. The only question is whether he watches at U.S. Bank Stadium or from the comfort of his home with friends. The answer to that question will depend on which teams are playing in the NFL championship game. What Lutz knows for sure is that Mystic Lake Center will be done on time, well before the official coin toss in February’s game. 

“I’m proud to have teamed with Dryvit in providing Swanson & Youngdale with a solution that gave PCL and Mystic Lake Casino Hotel the time savings they needed to get this project done in time for the ultimate game in sports,” says Lutz.

KEYWORDS: drywall EIFS exterior cladding scaffolding

Share This Story

Looking for a reprint of this article?
From high-res PDFs to custom plaques, order your copy today!

Recommended Content

JOIN TODAY
To unlock your recommendations.

Already have an account? Sign In

  • Abercrombie & Fitch

    EIFS in 2026: How Specialty Finishes Are Redefining Exterior Wall Systems

    As building codes, owner expectations, and design demands...
    Stucco/EIFS
    By: Regi Mendoza
  • proper air and vapor control

    From Energy Efficiency to Moisture Management: Why Air and Vapor Control Matter

    How proper air and vapor control within building...
    Building Envelope
    By: Benjamin Meyer AIA, LEED AP
  • Linear Metal Ceiling Beam Baffles

    Top 25 Ceiling Contractors of 2026

    Suspended ceilings demand precision, code compliance and...
    Ceilings
    By: John Wyatt and Tanja Kern
You must login or register in order to post a comment.

Report Abusive Comment

Manage My Account
  • eMagazine Subscription
  • Newsletters
  • Online Registration
  • Manage My Preferences
  • Subscription Customer Service

More Videos

Sponsored Content

Sponsored Content is a special paid section where industry companies provide high quality, objective, non-commercial content around topics of interest to the Walls & Ceilings audience. All Sponsored Content is supplied by the advertising company and any opinions expressed in this article are those of the author and not necessarily reflect the views of Walls & Ceilings or its parent company, BNP Media. Interested in participating in our Sponsored Content section? Contact your local rep!

close
  • medical professionals moving a patient on a stretcher through the halls of a medical building
    Sponsored byNational Gypsum Company

    What Does High Performance Mean When It Comes To Gypsum Boards?

Popular Stories

Linear Metal Ceiling Beam Baffles

Top 25 Ceiling Contractors of 2026

Wichita Biomedical Campus

Wichita Drywall Worker Dies After Scaffolding Fall

QXO Just Changed the Game-Here's What Contractors Are Asking

QXO Just Changed the Game-Here's What Contractors Are Asking

An interior drywalling work in progress

Boost Profits with AI Scheduling

Events

June 24, 2026

The Bright Side & Benefits of Designing with Integrated Lighting

Credits 1 AIA LU/HSW; 0.1 ICC CEU

This course will explore the pivotal role architects and lighting design play in creating safer, more sustainable spaces. Learn how to avoid common lighting mistakes and make informed decisions that create the best visual environment for occupants. 

January 1, 2030

Webinar Sponsorship Information

For webinar sponsorship information, visit www.bnpevents.com/webinars or email webinars@bnpmedia.com.

See our full library of webinars

View All Submit An Event

Products

2026 National Painting Cost Estimator

2026 National Painting Cost Estimator

See More Products

Related Articles

  • Tampa homeowners welcome Super Bowl "Kickoff to Rebuild" volunteers

    See More
  • The Super Bowl, Sunshine and Spray Foam

    PODCAST: The Super Bowl, Sunshine and Spray Foam

    See More
  • SPEC MIX BRICKLAYER 500 logo.jpg

    Wisconsin Bricklayer Mike Schlund Wins “Super Bowl of Masonry” — Again

    See More

Related Products

See More Products
  • business.png

    How to Succeed With Your Own Construction Business

  • Construction Spanish to English Dictionary

  • 0071489738.jpeg

    Construction Waterproofing Handbook Second Edition

See More Products

Related Directories

  • Super Stud Building Products

    Cold-formed steel studs, tracks, channels, accessories, and drywall beads and trims. Includes deflection tracks, slide clips, area separation wall, and shaft wall, as well as engineering services
×

Connect with the industry’s leading resource for unparalleled insights and education.

Join thousands of industry professionals today. Shouldn’t you know what they know?

JOIN NOW
  • RESOURCES
    • Advertise
    • Contact Us
    • Directories
    • Store
    • Want More
  • SIGN UP TODAY
    • Create Account
    • eMagazine
    • Newsletters
    • Customer Service
    • Manage Preferences
  • SERVICES
    • Marketing Services
    • Reprints
    • Market Research
    • List Rental
    • Survey/Respondent Access
  • STAY CONNECTED
    • LinkedIn
    • Facebook
    • Instagram
    • YouTube
    • X
  • PRIVACY
    • PRIVACY POLICY
    • TERMS & CONDITIONS
    • DO NOT SELL MY PERSONAL INFORMATION
    • PRIVACY REQUEST
    • ACCESSIBILITY

Copyright ©2026. All Rights Reserved BNP Media, Inc. and BNP Media II, LLC.

Design, CMS, Hosting & Web Development :: ePublishing