Walls & Ceilings logo
search
cart
facebook twitter linkedin youtube youtube Spotify Podcasts Apple Podcasts Spotify Podcasts Apple Podcasts
  • Sign In
  • Create Account
  • Sign Out
  • My Account
Walls & Ceilings logo
  • NEWS
  • TOPICS
    • Drywall
    • Stucco/EIFS
    • Ceilings
    • Steel Framing
    • Fireproofing
    • Interior Plaster
    • Building Envelope
    • Insulation
    • Technology
    • Interior
    • Exterior
    • Women In Construction
  • COLUMNS
    • Up Front
    • All Things Gypsum
    • Art & Craft of Plastering
    • Stucco Stop
    • Steel Deal
    • Industry Voices
  • PRODUCTS
    • Buzz Guide
  • EVENTS
    • Industry Events
    • Webinars
    • BUILD Expo
  • MEDIA
    • Videos
    • Podcasts
    • Photo Galleries
    • BUILD26 Videos
    • Take our Quiz!
    • Infographics
  • EXCLUSIVE
    • Newsletters
    • Top 50 Contractors
    • Contractor of the Year
    • State of the Industry
    • W&C Store
    • Market Research
    • CEUs
    • Sponsor Insights
    • Custom Content & Marketing Services
  • DIRECTORY
  • EMAGAZINE
    • eMagazine
    • Advertise
    • Archive Issues
  • SIGN UP!
DrywallExteriorOnline Exclusives

New Medical Building Achieves LEED Certification

Kaiser
January 8, 2019

The Oakland, California-based health care company, Kaiser Permanente, recently commissioned HMC Architects to design a medical office facility that would meet the demanding standards for LEED Platinum certification. The 28,000-square-foot building in La Habra, California features 25 exam rooms and 16 physician offices. HMC’s design emphasizes occupant comfort and energy efficiency while maintaining compliance with strict environmental regulations.

Swinerton Builders, the lead contractor on the project, faced the challenge of minimizing thermal breaks and preventing moisture intrusion in the stucco-clad wall assembly. Traditional stucco installation involves putting thousands of holes through the insulation and weather barrier layers to attach metal lath—possibly leaving the assembly vulnerable to air and water penetration. To eliminate this potential weakness, Swinerton and HMC Architects combined the latest envelope technologies with the traditional appeal of stucco in the most environmentally responsible way possible.

 

Approach & Solution


After an extensive evaluation of products that could meet their demanding requirements, HMC chose Atlas EnergyShield Pro continuous wall insulation in tandem with the patented Diamond Furr TT-4 lath attachment system by Brand X Metals. This combination of high R-value insulation and penetration-reducing stucco installation yields a thermally efficient wall assembly that is also an air and watertight barrier, ensuring the design’s success.

HMC recognized that Atlas EnergyShield Pro provides the highest R-value per inch of any insulation. This allows a thinner insulation profile, an important consideration when designing with heavier claddings such as stucco.  EnergyShield Pro resists water, air and vapor penetration and offers zero ozone depletion potential (ODP) and zero global warming potential (GWP), making it an environmentally responsible choice as well. In addition, EnergyShield Pro has recently earned UL’s GREENGUARD Gold certification for low VOC emissions.

Having chosen a premium insulation, the HMC team turned their focus to maintaining the integrity of the thermal, moisture and air barrier—a difficult task to achieve with stucco as it is conventionally installed. The Diamond Furr TT-4 system by Brand X Metals, Inc. solves the problem of stucco lath attachment through the envelope by reducing the overall number of fasteners required and sealing the remaining fasteners to maintain the integrity of the air and moisture barrier.  The Diamond Furr TT-4 system also incorporates wire-tied lath, greatly reducing the possibility of cracks in the stucco and moisture penetration. Tested in an accredited IAS testing lab, Diamond Furr eliminates fasteners around termination points and reduces field fasteners by 55 percent. This results in an 85 percent overall reduction in the number of fasteners used to attach the stucco.

On the Kaiser building, each 4 x 8-foot sheet of EnergyShield continuous insulation is held in place by the Diamond Furr TT-4 system and is secured with only two fasteners penetrating the insulation. Each penetration is covered with a 4 x 4-inch piece of foil tape. Diamond Furr furring strips, each backed with PVC strips that seal fastener penetrations through them, are applied in the field of the wall over the insulation and secured with screws. Wire ties secure the stucco lath to the Diamond Furr system, allowing sufficient movement in the stucco and avoiding penetration of the envelope.

 

Impact & Results


The Kaiser building is the first LEED Platinum certified medical office building in Southern California. Thanks in part to Atlas EnergyShield Pro wall insulation, Kaiser will enjoy long term cost savings through reduced energy use while the occupants enjoy the comfort that comes from improved air and moisture control in the building envelope. Doctors and patients alike will also benefit from EnergyShield’s low VOC content as demonstrated by its GREENGUARD Gold listing. Kaiser was also able to shrink HVAC unit sizes to reduce energy and carbon emissions for the building moving forward and ensuring it remains energy efficient in operation.

The building’s HVAC, cool roof coating, high insulation walls and roof, dynamic glass tinting, daylight harvesting and renewable energy sources collectively contribute to a 74.2 percent energy savings across the building.

Source: Building Enclosure
KEYWORDS: CI (continuous insulation) energy efficiency LEED medical building

Share This Story

Looking for a reprint of this article?
From high-res PDFs to custom plaques, order your copy today!

Recommended Content

JOIN TODAY
To unlock your recommendations.

Already have an account? Sign In

  • Abercrombie & Fitch

    EIFS in 2026: How Specialty Finishes Are Redefining Exterior Wall Systems

    As building codes, owner expectations, and design demands...
    Stucco/EIFS
    By: Regi Mendoza
  • proper air and vapor control

    From Energy Efficiency to Moisture Management: Why Air and Vapor Control Matter

    How proper air and vapor control within building...
    Building Envelope
    By: Benjamin Meyer AIA, LEED AP
  • Linear Metal Ceiling Beam Baffles

    Top 25 Ceiling Contractors of 2026

    Suspended ceilings demand precision, code compliance and...
    Ceilings
    By: John Wyatt and Tanja Kern
You must login or register in order to post a comment.

Report Abusive Comment

Manage My Account
  • eMagazine Subscription
  • Newsletters
  • Online Registration
  • Manage My Preferences
  • Subscription Customer Service

More Videos

Sponsored Content

Sponsored Content is a special paid section where industry companies provide high quality, objective, non-commercial content around topics of interest to the Walls & Ceilings audience. All Sponsored Content is supplied by the advertising company and any opinions expressed in this article are those of the author and not necessarily reflect the views of Walls & Ceilings or its parent company, BNP Media. Interested in participating in our Sponsored Content section? Contact your local rep!

close
  • medical professionals moving a patient on a stretcher through the halls of a medical building
    Sponsored byNational Gypsum Company

    What Does High Performance Mean When It Comes To Gypsum Boards?

Popular Stories

Linear Metal Ceiling Beam Baffles

Top 25 Ceiling Contractors of 2026

Wichita Biomedical Campus

Wichita Drywall Worker Dies After Scaffolding Fall

QXO Just Changed the Game-Here's What Contractors Are Asking

QXO Just Changed the Game-Here's What Contractors Are Asking

An interior drywalling work in progress

Boost Profits with AI Scheduling

Events

June 24, 2026

The Bright Side & Benefits of Designing with Integrated Lighting

Credits 1 AIA LU/HSW; 0.1 ICC CEU

This course will explore the pivotal role architects and lighting design play in creating safer, more sustainable spaces. Learn how to avoid common lighting mistakes and make informed decisions that create the best visual environment for occupants. 

January 1, 2030

Webinar Sponsorship Information

For webinar sponsorship information, visit www.bnpevents.com/webinars or email webinars@bnpmedia.com.

See our full library of webinars

View All Submit An Event

Products

2026 National Painting Cost Estimator

2026 National Painting Cost Estimator

See More Products

Related Articles

  • USGBC Logo

    U.S. Green Building Council Report Reveals Prominence of LEED Certification

    See More
  • ClarkDietrich logo

    ClarkDietrich’s New EPD Optimization Report is LEED Certification “Game-Changer”

    See More
  • BREAKING NEWS DEFAULT IMG

    Firestone Building Products Introduces Comprehensive Product Guide for LEED Certification

    See More

Related Products

See More Products
  • building codes illustated.jpg

    Building Codes Illustrated: A Guide to Understanding the 2021 International Building Code, 7th Edition

  • bim 3e.jpg

    BIM Handbook: A Guide to Building Information Modeling for Owners, Designers, Engineers, Contractors, and Facility Managers, 3rd Edition

See More Products
×

Connect with the industry’s leading resource for unparalleled insights and education.

Join thousands of industry professionals today. Shouldn’t you know what they know?

JOIN NOW
  • RESOURCES
    • Advertise
    • Contact Us
    • Directories
    • Store
    • Want More
  • SIGN UP TODAY
    • Create Account
    • eMagazine
    • Newsletters
    • Customer Service
    • Manage Preferences
  • SERVICES
    • Marketing Services
    • Reprints
    • Market Research
    • List Rental
    • Survey/Respondent Access
  • STAY CONNECTED
    • LinkedIn
    • Facebook
    • Instagram
    • YouTube
    • X
  • PRIVACY
    • PRIVACY POLICY
    • TERMS & CONDITIONS
    • DO NOT SELL MY PERSONAL INFORMATION
    • PRIVACY REQUEST
    • ACCESSIBILITY

Copyright ©2026. All Rights Reserved BNP Media, Inc. and BNP Media II, LLC.

Design, CMS, Hosting & Web Development :: ePublishing