Value-engineering can compromise durability. Discover how specialty high-performance gypsum boards protect projects from weather, wear and noise, ensuring a resilient investment that satisfies architects, contractors and owners alike.
Gypsum panels should be delivered as close to installation as possible and stored indoors in a dry, enclosed, weather-tight area, off the ground on a level platform, with proper support and ventilation, to prevent moisture damage, material loss, and safety hazards.
Gypsum panels should be delivered as close to installation as possible and stored indoors in a dry, enclosed, weather-tight area, off the ground on a level platform, with proper support and ventilation, to prevent moisture damage, material loss, and safety hazards.
Contractors are pushed toward tighter, more energy-efficient building envelopes. making continuity in insulation, air sealing, and moisture control essential and increasing the importance of integrated materials like spray foam, structural sheathing, coatings, and sealants to meet rising performance standards.
Modern updates to the IECC 2024 and ASHRAE 90.1-2022 push contractors toward tighter, more energy-efficient building envelopes, making continuity in insulation, air sealing, and moisture control essential and increasing the importance of integrated materials like spray foam, structural sheathing, coatings, and sealants to meet rising performance standards.
How proper air and vapor control within building enclosures is essential for energy efficiency, moisture management, and long-term durability, emphasizing the need for continuous, well-integrated control layers and coordinated installation to prevent damage, inefficiency, and health issues.
At World of Concrete 2026, Polyglass U.S.A., Inc. will feature hands-on demonstrations and integrated waterproofing systems that help wall and ceiling assemblies resist moisture intrusion—from below-grade transitions to air and vapor control layers in commercial and industrial buildings.
Contractors can now monitor temperature, humidity, and substrate readiness through StructreCloud, helping align installation schedules and safeguard materials.
Western’s work was performed in phases, both vertically and horizontally, to allow for the hospital to manage office and patient room areas impacted by the work.
Western Specialty Contractors - Chicago Facades Branch recently completed Phases 1-5 of a multi-phased, interior AVB and exterior facade repairs to a building at a medical center campus in the north suburbs of Chicago.