Walker & Dunlop, Inc. announced that it structured a $15,509,300 loan for Manseau Flats, a 78-unit, Class A multifamily development located along the western bank of the Fox River in Ashwaubenon, Wisconsin.
The collaborative office space features Valspar's Fluropon Classic II exterior architectural metal coating in the color Pewter to adorn the building’s exterior.
The Wharf in Washington DC, which recently opened the first phase of a $2.5 billion mixed-use waterfront development to the public, features SmithGroupJJR’s design for two hotel companies that share one dynamic building.
The architecture and urban design firm Cooper Robertson has been selected for the master planning of what is considered the largest mixed-use project in New Jersey history.
The Sterling Merchandising facility in Bayamon, Puerto Rico, was constructed with insulated metal panels from Metl-Span and survived Hurricane Maria, the category 4 hurricane, with no leaks and minimal damage.
The new Moving Everest Charter School, located in the Austin neighborhood on the Far West Side of Chicago, utilizes a unique model that accommodates both the new charter school as well as a provider of after-school programs.
eSUB Construction software offers Eagle’s View Construction an all-in-one collaboration platform for its field teams and office staff to optimize productivity in the field and office.
Interior renovations reposition a static office building, part of this architecture and interiors firm’s significant portfolio of reinvigorated and attractive corporate centers