ProCollection polyurethane moldings offer builders the shortest lead-time in the industry, shipping within three to five days of order placement. The collection includes the company's 10 most popular designs. Created
The Wood Carved Pierced Moldings effortlessly and seamlessly fasten together end-to-end by means of simple wooden dowels, which when glued and inserted into the predrilled opposing holes of adjacent wood
Point of Beginning Editor Lieca Brown and Walls & Ceilings Art Director James Hohner Jr. on site for the first day of the Habitat for Humanity Jimmy Carter Work Project, Saturday, June 18.
The Bearing Bridge Adapter serves as a link between a bearing bridge and two P Series units allowing amplify the installation significantly. Consequently, the P Series configuration can become as
The Tow-Pro trailer mounted boom lifts with larger working envelopes and faster towing speeds (up to 65 mph) than similar products on the market. They also feature self-leveling hydraulic outriggers,
The CoolMax is a NIOSH-approved N95 sanding, drywall and fiberglass respirator. Its patented design allows workers to breathe up to two times easier and it lasts up to three times
The Acriglo is designed to provide illumination without a back-up power source during the loss of electricity. It is charged completely by the luminosity omitted during the normal operation of
The Scaffoldmate is designed to fit on most 4-foot fold up scaffolding along with the E-Z Box, which is a spacious box that will hold up to 25 pounds. It
The Max Climber 3300 Transport Platform Hoist System features heavy-duty galvanized mast sections with a payload lifting capacity of up to 3,300 pounds. It has a single-masted system and is
The MG-30 is for a wide range of applications including high-production placement of exterior stucco, sand/cement exterior basecoat, gypsum plaster and lightweight aggregate, interior basecoat plaster, pool plaster Pebble-Tec and