With red iron steel framing in place at the large 71’-0” diameter dome, Competitive Interiors Inc. contracted Radius Track Corporation for multiple cold-formed steel framing solutions.
The Children’s Hospital of San Antonio renovation project presented layout space restrictions, trade overlap, tight schedule requirements, and close proximity to occupied spaces. MK Marlow Company LLC, the framing and gypsum contractor, depended on Radius Track Corp. from the beginning by inviting the framing design expert to bid coordination meetings which were held via web-based video conference.
Incorporating fabricated models into BIM workflows and situations continues to be a challenge for many engineers and contractors—VIATechnik is making this process easier by offering solutions for forward—thinking mechanical, electrical, and plumbing contractors.
The first conference agenda led by owners, designers and contractors to focus on integration and collaboration will be held August 26-27 in San Francisco.
When using the latest version of GPD Tools, Autodesk Revit users will now be able to access courses that are relevant to the BIM objects they are working with.
ClarkDietrich announced that the newest version of its Wall Type Creator Revit add-in is now available for free download at the Autodesk Exchange store.